DBIA - Principles of Design-Build and Post Award Exam Graded A+(100% Verified)
Co-location - The term used to describe the situation where the designers and contractors are placed in close proximity to one another, often in the same office or jobsite trailer. Design Reconciliation - The process of managing the design to a set of pre-determined "targets" ADePT - Technology to assess design value. Request for Proposals - Document the describes the procurement process, forms the basis for final proposals an becomes an element of the contract. RFP, Technical Proposal, Price Proposal - Three documents that initially govern the DB agreement in the best value competition. Controlling Party - The party holding the prime contract position in a multiple firm DB contractual relationship. 35% - Design Build RFP's will be evaluated off of less than what percentage for qualifications based evaluation. Negotiate - What the DB'er now has the right to do after award of contract. Honorarium - A stated amount sometimes paid to unsuccessful proposers in consideration of preparing a Design-Build Proposal. Spearin Doctrine - The owner warrants the sufficiency of the plans and specs to the contractor under this regulation.Shortlisting - The process of narrowing the field of DB teams through the selection of the most qualified proposers on the basis of qualifications.
Written for
- Institution
- DBIA - Principles of Design-Build and Post Award
- Course
- DBIA - Principles of Design-Build and Post Award
Document information
- Uploaded on
- October 20, 2023
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
dbia principles of design build and post award
Also available in package deal