DBIA - Project Delivery Exam Solved 100% Correct!!
Miller Act - The existing federal law that required federal projects exceeding 100k to require both a performance and a payment bond. Created a legal separation between construction & Design Delivery system, Type of Procurement and Type of Contract Format. - What are 3 fundamental decisions an Owner must make when initiating a feasible project? Design Bid Build (Low Bid) - What is the most common project delivery system? The Owner - In traditional DBB delivery, who does the architect sign their contract with? None - What type of relationship does the contractor have with an architect in Design Bid Build? Scheduling Restraints or needs to be fast-tracked - Why would you choose a Design Build delivery System? Design Build - If the owner wants to shift risk to one party, what project delivery method would they choose? Design Build - What type of project delivery best suits a complex project requiring close coordination of design and construction expertise? 1 - Joint Venture 2 - Integrated DB Firm 3- A/E Led 4 - Contractor Led - What are some forms of Design Build entities? Yes - Does the Owner bear risk in a design-bid-build?1 - Linear project delivery 2 - Well defined and familiar relationships 3 - Benefit of Open Market Competition 4 - Owner is actively involved in design until documents are 100% complete - What are some reasons owners choose DBB? Limiting Factors to Design Build - 1 - Owner wants absolute design control 2 - The programming limits flexibility and innovation 3 - The Owner cannot provide programming and performance requirements. Contractor Led - The most common DB entity structural arrangement? 1 - Contractor 2 - Architect - What contracts does the owner holds in a CM @ Risk delivery method. Qualifications and Best Price - How architect/engineering firms are typically selected? Sole Source/Direct Selection - A procurement option where the DB'er is selected strictly on the basis of predetermined values and qualification criteria already determined in consideration of reputation of prior dealings with the owner? Often highly specialized.
Written for
- Institution
- DBIA - Project Delivery
- Course
- DBIA - Project Delivery
Document information
- Uploaded on
- October 20, 2023
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal