100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

LARE Section 1 Study Questions & Answers 100% Verified!!

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
12-10-2023
Written in
2023/2024

Addendum vs Bulletin vs Change Order - ANSWERAddenda are issued after a project goes to bid, but before bids are evaluated. Bulletins and change orders are issued during construction. A bulletin is a request for a change from the design/construction side. A change order is a change to the contract and typically involves a change in scope or change in fees due to inaccurate or incomplete plans, details or specs. What types of situations might prompt a change order? - ANSWERUsually anything that results in a change in scope or fees; drawings errors and/or omissions, design changes, inaccurate specs, unforeseen soil conditions, inaccurate estimate of materials needed, etc. *Note that a change order can also result in reduced fees for contractor if substituted materials cost less than previously specified materials. What could happen if a landscape architect takes calls from a bidding contractor during the bidding process? - ANSWERThe bids could become invalidated and the landscape architect could become liable for the cost of bidding. During bidding all questions have to be submitted in writing to ensure all bidders have access to the same information. Who submits shop drawings? - ANSWERThe contractor or product manufacturer. What are shop drawings? Shop drawings vs specifications? - ANSWERAny submittal to the PM for review including details design calculations, design drawings, fabrication and installation drawings, erection drawings, lists, graphs, operating instructions, catalog sheets, data sheets, samples and similar items Shop drawings are not contract documents While contract plans and specifications (including Supplemental and Special Provisions) define the overall nature of the project with many specific requirements, Shop Drawings provide a method for the Contractor to propose, under the specification guides, a particular material, product or system of accomplishing the work. What is included in awarding the contract? - ANSWER1. Advertising 2. Receipt and bid opening 3. Bid evaluation 4. Contract c

Show more Read less
Institution
LARE
Course
LARE









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
LARE
Course
LARE

Document information

Uploaded on
October 12, 2023
Number of pages
15
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Papersbylee Chowan University
View profile
Follow You need to be logged in order to follow users or courses
Sold
22
Member since
2 year
Number of followers
14
Documents
1264
Last sold
3 months ago

3.3

7 reviews

5
1
4
1
3
4
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions