PROPRAC EXAM 3 QUESTIONS WITH 100% CORRECT ANSWERS | VERIFIED
Accepts employment as Design Architect for a competition project. - correct answer Which is an unethical action with respect to the Architect's responsibility to his colleagues and subordinates? serving as professional adviser, Structural conceptualization - correct answer The act of conceiving, choosing and developing the type, disposition, arrangement and proportioning of the structural elements of an architectural work giving due consideration to safety, cost-effectiveness, functionality and aesthetics. Architectural Programming - correct answer Pre-design service involves investigating, identifying and documenting the needs of the client for use in the design of the project. Performance Bond - correct answer Approved form of security furnished by the Contractor and his Surety as a guarantee of good faith on the part of the Contractor to execute the work in accordance with terms of the Contract. Written Notice - correct answer Invitations issued to prospective bidders, giving information as to the nature of the proposed project, conditions for the issuance of contract documents, date of bidding, and estimated cost or information that would give the Contractor a general idea of the magnitude and extent of the project. Invitation to Bid - correct answer Invitations issued to prospective bidders, giving information as to the nature of the proposed project, conditions for the issuance of contract documents, date of bidding, and estimated cost or information that would give the Contractor a general idea of the magnitude and extent of the project. serving as professional adviser, accepts employment as Design Architect for a competition project. - correct answer Which is an unethical action with respect to the Architect's responsibility to his colleagues and subordinates? structural conceptualization - correct answer The act of conceiving, choosing and developing the type, disposition, arrangement and proportioning of the structural elements of an architectural work giving due consideration to safety, cost-effectiveness, functionality and aesthetics. multiple of direct personnel expense - correct answer What method of compensation is most suitable for compensating the Architect's services for the pre-design phase? P150,000.00 - correct answer If the estimated cost for a residential project is P10,000,000.00, how much should the Architect bill the Client upon completion of the Schematic Design Phase if a downpayment of P50,000.00 has been made upon signing of the agreement ? 85% - correct answer Within 15 days after the awards of Bids, the payment to the Architect shall be adjusted so that it will amount to a sum equivalent to how many percent of the Basic Fee, computed upon the winning Bid Price? Bid Bulletin - correct answer Additional information on Contract Documents issued to bidders before date of bidding. assists Owner on documents for government approval - correct answer Which activity is included in the Contract Document Phase of the Architect's Regular Design Services? 6 months - correct answer If portions of the buildings are erected at different periods of time, thus increasing the Architect's construction period and burden of services, the charges pertaining to services rendered shall be doubled. A suspension of construction for a period not exceeding ____ months shall not be covered by this provision. Guarantee Bond - correct answer Approved form of security furnished by the Contractor and his Surety as a guarantee to the quality of the materials and equipment installed and the workmanship performed by the Contractor. Breakdown of Work an Corresponding Value - correct answer Listing of the different parts of the work indicating in each part the corresponding value in materials and labor, including an allowance for profit and overhead. value-added tax - correct answer The Architect's Fee is net to the Architect. What tax that the government may impose on the Architect shall be paid by the Owner? brand name specification - correct answer What type of specification does this statement refer to? - "FAN - the fan shall be Model No. XYZ as manufactured by the Static Air Fan Company of Texas or an equal approved by the Architect" P500.00 / 100 km. - correct answer A per diem of not less than _____ plus traveling and living expenses shall be chargeable to the Owner on any occasion where the Architect or his duly authorized representative shall be required to perform services at a locality beyond the radius of ____ kilometers from his established office. Contractor - correct answer Promptly issuing the Certificates of Payment and the Final Certificate of Completion is a responsibility of the Architect to whom? Notice to Proceed - correct answer This shall be issued by the Owner to the Contractor following the execution of the Contract Agreement. accepts market discounts credited to client - correct answer Which is an ethical action with respect to the Architect's responsibility to his manufacturer's, dealers and agents? fees for mechanical systems design - correct answer Which is included in the Architect's Professional Fee? makes periodic visits to the site - correct answer Which of the following is a responsibility of the Architect in the Construction Phase of the Regular Design Services? guarantee any estimates or cost of the work - correct answer Which is an unethical action with respect to the Architect's responsibility to his client? take part in paid endorsement of building material - correct answer Which is an unethical action with respect to the Architect's responsibility to the people? prepares PERT-CPM - correct answer Not a function of the Construction Supervision Group. 4% - correct answer For the preparation of detailed engineering drawings and specifications on roads, drainage, sewerage, power and communication system, an additional of how many percent of the cost of development is to be charged? American Society for Testing and Materials - correct answer ASTM clerk-of-works - correct answer Traditional name for construction inspectors. Closed - correct answer A type of specification stipulating the use of specific product/s or processes without provision for substitution. involve directly with the contractor's work. - correct answer Not among the functions of the Construction Management Group. P3,000.00 per hectare - correct answer What is the basic rate for the first 100 hectares or less for subdivision planning for housing on properties within Metro Manila, cities, regional centers and provincial capitals? 10% - correct answer What percentage of the Architect's Basic Fee is for the liability of the Architect under the Civil Code? communications and electronic system - correct answer The Project Construction Cost referred to in the compensation of the Architect for his Regular Design Fee means the cost of the completed structure which include one of the following: ambiguous sentences - correct answer Which should be avoided in specifications writing? Thermal and Moisture Protection - correct answer What is Division 7 of the 16-division uniform construction index? administrative matters - correct answer The Construction Supervision Group is responsible to the Owner on what matter? requirements of regulatory agencies - correct answer Included under Part I-General Requirements of a three-part section specification format. Each exposed surface shall be painted with two coats of paint - correct answer Which is the preferred statement in good specification writing? open and closed - correct answer Which combination of types of specifications is impossible? cost plus incentive fee - correct answer A cost reimbursement type contract with provisions for a fee that is adjusted by "sharing" formulas applied to the difference between the final allowable costs and the target costs. 15 days - correct answer Within how many days from the date the change is ordered shall any claim for adjustment involving questions of fact be asserted. 4 - 6% - correct answer What is the rate of the Management Fee for Post Construction Services based on percentage of gross rentals? Closed - correct answer What specification type identifies the manufacturer's name and brand number? Which is ethical practice? - correct answer An architect offers free design services for a church composed of architecture graduates - correct answer As per PD 223, what would disqualify an architectural organization to be accredited by the PRC? Brickwork shall be laid in stretcher bond. - correct answer Which of the following is the best example in specification writing? cost of the work - correct answer The total cost of all equipment, utilities and other items which were either designed, specified or procured by the Architect and his Consultants for the Owner, that were used or installed in the project. estimate guaranteed 10% +/- - correct answer A characteristic of the Design-Build Service by Administration. 10 - 15% - correct answer How many percent of the cost of the work is the range of fees for landscape design services?
Written for
- Institution
- ProPrac
- Course
- ProPrac
Document information
- Uploaded on
- October 6, 2023
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
proprac exam 3 questions with 100 correct answers
Also available in package deal