100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Construction Management Final Exam Latest Update (2023/2024) Graded A

Rating
-
Sold
2
Pages
27
Grade
A+
Uploaded on
02-10-2023
Written in
2023/2024

Construction Management Final Exam Latest Update (2023/2024) Graded A Why are the MSDS so important for workers to read at the job site? Material Safety Data Sheet provide important knowledge on how to work with toxic materials at the job site. Quality assurance includes all of the following practices EXCEPT: Testing standards Which of the following is NOT an item of personal protective equipment that might be used by workers on the jobsite? Hardhat, Gloves Which of the following is NOT a type of personal protection equipment? Skin Protection Which of the following does NOT describe preparatory inspections? Preparatory inspections are never done by personnel employed by the contractor Which of the following are primary cause of injuries in the construction industry? Slips Trips and Falls, Being crushed or trapped, Electrical shocks Which of the following are primary component of an effective safety management plan? Substance abuse, Hazardous material communications, Personal protection Which Federal agency is responsible for establishing safety standards and enforcing them through inspections conducted at construction jobsites? OSHA Which quality control mechanism are mandated by the construction contract and used to check for conformance to the plans and specifications? submittals, mock ups, shop drawings Which of the following shows the general relationship between the level of quality and cost? when quality increases, cost increases All of the following are fundamental objectives of a quality management plan: Do things right the first time, Prevent things from going wrong, Continually improve the process What is an FOR? A report used to track questionable quality and safety performance on the jobsite Which of the following is a difference between quality control and quality assurance? Quality control happens at the project level while quality assurance happens at the process level The name of the testing agency for construction in the United States is: ASTM What is not the concept behind a zero-punch list? Complete the final walk-through with as many of the punch items noted on the list, To have no change orders on the project, Please every expectation of the owner What is the cost code chart usually made up of? activity, code, project number What is the riskiest element of the project control and project planning? estimating productivity Periodic predictions stated in reports as to the final cost and schedule outcomes on a project while the work is still going on are known as: forecasts What is an example of a factor that can impact project performance? Defective Material, Hurricane in your project area, Overcrowded Job sites What is NOT an escalation clause? It is a clause that covers when the truck can deliver building materials, It is the same thing as a contingency and tries to account for unforeseen conditions, It is a clause that covers risks associated with underground utilities, grading, and excavation What is the essential(s) of an effective project control system? Quality Information , Good Reporting system What does it mean to crash the schedule? To compress the overall schedule by accelerating certain activities within it so that they finish sooner What does it mean to forecast in project management? To predict the final cost and schedule outcomes on a project while the work is still in progress What are the three primary tracking elements when monitoring project performance? Quality, Cost, and Time What is not one of the fundamental steps that is included in the project control cycle? update technology The cost or time difference between the actual project performance and the planned project performance is the definition of what? variance What is NOT an example of a source where you might gather field information needed to develop your project controls? requests for information All of the following are TRUE regarding project activities

Show more Read less
Institution
Construction Management
Course
Construction Management










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Construction Management
Course
Construction Management

Document information

Uploaded on
October 2, 2023
Number of pages
27
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StellarScores Western Governers University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1907
Member since
2 year
Number of followers
864
Documents
21100
Last sold
1 day ago
Your Academic Hub: Documents, Study Guides, Summaries, Essays, and Exclusive Package Deals.

Welcome to my comprehensive academic resource store! At my online hub, I offer a vast array of meticulously crafted documents, study guides, summaries, and essays to support your educational journey. I understand the value of accuracy and completeness, which is why all my materials are verified and kept up-to-date with the latest versions. But that's not all! I also offer exclusive package deals and bundles to provide you with cost-effective solutions for your academic needs. Whether you're a student looking for study aids or seeking in-depth knowledge, my store is your one-stop destination for reliable, top-quality materials that can propel your learning experience to new heights. Explore my offerings and unlock the keys to academic success today!

Read more Read less
4.0

439 reviews

5
238
4
78
3
61
2
24
1
38

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions