Xactimate 28 exam |108 questions fully solved & updated 2023.
Xactanalysis Allows you to send, receive and track assignments electronically. Xactimate Where the assignment can be opened and information added to describe the loss and damages along with the estimated loss and repairs. Xactanalysis When the assignment is complete is can be returned to _______________ and used to create management reports that will help track the efficiency of the workflow process What is the best way to avoid adding a duplicate contact into Restoration Manager? Perform a search to see if the contact already exists When adding a company contact, you MUST add a Primary and a Secondary contact. FALSE A blue colored box in the New Lead form indicates: The box is required to fill out Even though it's not required, it is important to fill out the year the structure was built on the form so the inspector will know if their might be asbestos in the building. TRUE What is NOT one of the options from the search drop down menu when searching for a job in restoration manager? Job By Email If you search for address information in the search box when the search category is set to "name," the program will still be able to find the job you are searching for. FALSE What is not one of the three sections in the Job Snap Shot? Mileage and Other Job progress is automatically updated when you add a date and time for the estimate progress in the Estimator and Sales section in the Job Snap Shot. TRUE You can track Tasks you have assigned in the Task Accountability section of the Dashboard. TRUE You can only use the task types Restoration Manager provides in the task type drop down. FALSE The correspondence subject field is limited to _____ characters. 233 The blue boxes in the correspondence field are not required to fill out. FALSE A document or photo must be on your desktop to upload it to Restoration Manager. FALSE To make changes to a referral source in a job, use the ___________ tab. Additional Contacts The project name in Xactimate and the Job ID in Restoration Manager must match to transfer the estimate information. TRUE Which tab do you click on to find the Xactimate estimate information? Costs/Finacials To find a breakdown of overhead and profit, which category do you select? Mileage and Other It is important to add a dollar sign when filling out the cost of the manually entered line item. FALSE Making a new budget overwrites any old budget. TRUE For a 28% increase, you would need to change the budget by what amount? 72% From the Job Details window, select the __________ tab to begin entering work orders. Losses Work Orders can't be printed. FALSE How can you tell if a job has been pushed from Xactimate? You will see a "Create WOs" tab with the Verisk logo. True or False: The budget button allows the user to assign budget percentages to Materials, Labor and Equipment. TRUE To add more than one piece of equipment to a job from the list, hold the ____ key as you select the pieces. CTRL You can't type a date in the due date box. You must click on the calendar to add a date. FALSE In addition to tracking equipment used on jobs, the Equipment Summary Report can track consumables used on the job. TRUE To see a complete history of what jobs a piece of equipment was used on, click the ______________ button. Show Usage When saving information in Restoration Manager, green pop-ups indicate a problem with the save. FALSE The purpose of moisture readings is to: Determine when a structure has been returned to a normal dry condition. Restoration Manager A comprehensive set of cloud based software tools for the restoration industry. This tools help you track and manage jobs, control schedules, monitor costs, manage work orders, track equipments, etc... Direct Supplier It's a product that we've created with our contractor customers in mind. The goal with direct supplier is to make it much easier for you to go from an Xactimate estimate to purchasing a materials for your job to send your project from Xactimate to direct supplier. Simply open up the project you're working on in Xactimate. Make sure you're in the carrier or contractor profile and then from any screen you come up to the upper left-hand side and you see this icon labeled. Send Xactware direct fire request, click on it and your project is automatically being sent to direct fire. You automatically been registered for the product supplier is a free product for all our contractor customers to click on this link. You'll be sent to the direct supplier page and you can log in with your Xactware ID and password.
Written for
- Institution
-
Stanford University
- Course
-
XACTIMATE CERTIFICATION
Document information
- Uploaded on
- October 2, 2023
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal