100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Construction Management questions with correct answers

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
28-09-2023
Written in
2023/2024

Distinguish between construction management as a function and construction management as a project delivery method. Correct Answer-The construction management function entails various tasks performed by the contractor such as estimating, scheduling, cost control, and contact administration in order to monitor, manage, and control the work of the contract for which the contractor is obligated. Construction management as a project delivery method is a contractual agreement whereby the construction manager is hired by the owner to provide services to the owner, such as design review, overall scheduling, cost control, value engineering, constructibility reviews, and construction coordination. Under CM project delivery, the construction manager may or may not be financially obligated to carry out the construction work itself. Identify at least three characteristics that make the construction project unique from other industry sector projects. Correct Answer-Each construction project is built as a one-of-a-kind structure or facility. Every construction project is built on a different and unique building site. The building process takes place outside. Much of the work is performed by the human hand. The labor force is by and large made up of transient workers moving from job to job. Name the four primary project values to be managed, monitored, and controlled. Correct Answer-Time, cost, quality and safety Why is scope definition so important in the construction process? Correct Answer-It describes the extent of the work that is to be performed by the contractor. What is meant by the term "project delive

Show more Read less
Institution
Construction Management
Course
Construction Management









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Construction Management
Course
Construction Management

Document information

Uploaded on
September 28, 2023
Number of pages
15
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2011
Member since
3 year
Number of followers
1342
Documents
46921
Last sold
9 hours ago
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

368 reviews

5
162
4
84
3
51
2
22
1
49

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions