CSP Latest 2023 Graded A+
CSP Latest 2023 Graded A+ Safety The state of being relatively free from harm, danger, injury, or damage Risk A measure of both the likelihood(probability) and consequences(severity) of all hazards of an activity or action What are two aspects of Risk? The measure of probability and severity The five steps of the risk management process? 1. Risk Identification 2. Risk analysis 3. Risk elimination or reduction 4. Financing risk 5. Administering the risk management process Calculate Risk Cost Probability X Cost Residual Risk The risk that remains after preventive measures have been taken. Does-Response Relationship Probability of getting a disease increases with the dose Threshold Risk Models "The dose makes the poison" There is a safe level of exposure No Threshold Risk Model Used in ionizing radiation There is no safe level Calculate OSHA Total Incident Rate (Total recordable injuries * 200,000) / Total Hours Calculate OSHA DART Rate (# DART Cases X 200,000) / Total Hours Calculate OSHA Severity Rate (# Lost Workdays X 200,000) / Total Hours Sections of an Insurance Contract 1. Declarations: What is insured 2. Conditions: What must be fulfilled
Written for
- Institution
- CSP - Certified Scrum Professional
- Course
- CSP - Certified Scrum Professional
Document information
- Uploaded on
- August 31, 2023
- Number of pages
- 69
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal