ProPrac Questions And Answers
In which project specification division would you expect to find windows: - 08 In which project specification division would you expect to find structural steel: - 05 The Architect's responsibility in review of a submittal provides for the following: - Limited checking for conformance with the contract documents Which is not a responsibility of the architect during the Construction phase: - Establish means and methods In which phase does the design team work out clear, coordinated description of the design including fully developed floor plans, sections, exterior elevations, wall sections and key details but not final details or comprehensive interior elevations: - Design Development Specifying end results that allow flexibility and creativity to meet requirements instead of describing exact characteristics or specific named products is known as: - Performance Specifying The specification 00 section that establishes a consistent understanding of the procedures that bidders should follow in preparing their bids such as consideration of bids is: - Instruction to Bidders The right for the owner to reject any or all bids is typically included in the bidding documents: - True The contractor determines the date of Substantial Completion: - False Who typically provides project record documents during project close‐out: - Contractor The variation of Design-build common in Europe and Japan where an owner contracts with an architect for schematic design and technical review during design and construction before handing the project over at design development to a design-build entity is known as: - Bridging
Written for
- Institution
- ProPrac
- Course
- ProPrac
Document information
- Uploaded on
- August 24, 2023
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers