100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CTS Exam Prep Questions and answers, 100% Accurate. Verified.

Rating
-
Sold
2
Pages
26
Grade
A+
Uploaded on
12-08-2023
Written in
2023/2024

CTS Exam Prep Questions and answers, 100% Accurate. Verified. What are the four teams that comprise the overall Project Team? - -Owner, Design, Installation, and Management Who would belong to the Design team? - -Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? - -Developer, Construction Manager, and Building Management Agency The End-User, Facility Manager and Building Committee comprise which team within the Project Team? - -Owner Which group represent the generic roles that are important to the Project process? - -Project Managers, Designers and Installers Which project characteristics must be considered in order to determine which method is best suited for a particular project? - -Schedule, Size, Type, Complexity, and Procurement Requirements What is an important aspect of funding that has a direct impact on the project process and design/installation? - -Technical Support Funding Whether a construction project is large or small, which milestones must be achieved in a typical schedule? - -Programming, Building Design, AV Bid, and Move-In What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - -Long term projects with extended project cycles What is the risk in using an OFE/Integrator Installed contract structure? - -System and infrastructure design and facility functionality may suffer What are some of the important project scope and size considerations in selecting an AV provider? - -Financial Stability, Current Workload, and Company Credentials What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel, and Warranty Response Time? - -RFQ a significant difference between the Two-Envelope Bid Method and the Qualifications- Based Selection Method? - -Negotiate with the highest ranking firm to finalize the contract What is one of the disadvantages of contracting the AV integrator to the electrical subcontractor? - -More layers of responsibility and communication When conducting a complete project bid process, what milestone follows the issuing of the RFP? - -Pre-Bid Meeting Under what circumstances would you likely use an A305-1986 form? - -Scoring responses to an RFQ What is the ideal way to contract an AV integrator? - -Directly to the Owner The process of identifying the activities that end-users need to perform, and developing the functional descriptions of your systems is referred to as:? - -Needs Analysis What is the main task of the third Step of the Program Phase of a Project? - -Conducting program meetings What should be included in

Show more Read less
Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Study
Course

Document information

Uploaded on
August 12, 2023
Number of pages
26
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CTS Exam Prep Questions and answers,
100% Accurate. Verified.

What are the four teams that comprise the overall Project Team? - ✔✔-Owner, Design, Installation, and
Management



Who would belong to the Design team? - ✔✔-Anyone with Consultant in their title except the moving
consultant



Which groups make up the Management Team? - ✔✔-Developer, Construction Manager, and Building
Management Agency



The End-User, Facility Manager and Building Committee comprise which team within the Project Team?
- ✔✔-Owner



Which group represent the generic roles that are important to the Project process? - ✔✔-Project
Managers, Designers and Installers



Which project characteristics must be considered in order to determine which method is best suited for
a particular project? - ✔✔-Schedule, Size, Type, Complexity, and Procurement Requirements



What is an important aspect of funding that has a direct impact on the project process and
design/installation? - ✔✔-Technical Support Funding



Whether a construction project is large or small, which milestones must be achieved in a typical
schedule? - ✔✔-Programming, Building Design, AV Bid, and Move-In



What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - ✔✔-Long
term projects with extended project cycles

,What is the risk in using an OFE/Integrator Installed contract structure? - ✔✔-System and infrastructure
design and facility functionality may suffer



What are some of the important project scope and size considerations in selecting an AV provider? -
✔✔-Financial Stability, Current Workload, and Company Credentials



What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel,
and Warranty Response Time? - ✔✔-RFQ



a significant difference between the Two-Envelope Bid

Method and the Qualifications- Based Selection Method? - ✔✔-Negotiate with the highest ranking firm
to finalize the contract



What is one of the disadvantages of contracting the AV integrator to the electrical

subcontractor? - ✔✔-More layers of responsibility and communication



When conducting a complete project bid process, what milestone follows the issuing of the RFP? - ✔✔-
Pre-Bid Meeting



Under what circumstances would you likely use an A305-1986 form? - ✔✔-Scoring responses to an RFQ



What is the ideal way to contract an AV integrator? - ✔✔-Directly to the Owner



The process of identifying the activities that end-users need to perform, and developing the functional
descriptions of your systems is referred to as:? - ✔✔-Needs Analysis



What is the main task of the third Step of the Program Phase of a Project? - ✔✔-Conducting program
meetings



What should be included in the written Program Report? - ✔✔-...A conceptual and functional system
description

, The more accurate means to estimate dimensions of a commercial space during a site inspection would
be to? - ✔✔-Count Ceiling Tiles in a drop tile instalation



A client requires a new boardroom. The sales person and engineer are sent to the premises to measure
the facility and talk to the client. At this stage they should be performing a _ - ✔✔-Needs Analysis



Sightlines for audience viewing in a given presentation space can be improved by: - ✔✔-Providing a
sloped, or stepped, seating arrangement



After presenting a proposal, what is the correct plan of action for following up with the client? - ✔✔-
Regularly, until a decision is made



AV professionals determine the end user's needs by examining three things: the required applications,
the tasks, and the: - ✔✔-Functions to support the applications



When working with a client to design an AV solution for a new conference center, the client requests a
detailed budget for the equipment and installation. What phase is the project in? - ✔✔-Design phase



The HDTV aspect ratio is equal to which of the following? - ✔✔-1.78:1



Please select the appropriate resolution for SXGA. - ✔✔-1280 x 1024



The Brightness control adjusts which level? - ✔✔-Black Level



For what purpose would the AV technician designate a loopback internet protocol address in the
127.0.0.1 to 127.255.255.254 range in a network configuration? - ✔✔-To test the local device to see if
TCP/IP is working on your system



It is important to consider Polar Patterns when____ - ✔✔-Selecting Microphones for use at live events
$10.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PassPoint02 Chamberlain School Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
173
Member since
3 year
Number of followers
105
Documents
4552
Last sold
6 days ago

4.1

39 reviews

5
22
4
6
3
5
2
4
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions