4th Class Power Engineering Unit B4: Boiler Plant Operation and Management | 183 Questions and Answers(A+ Solution guide)
If a new boiler is not properly boiled out, it may result in: Select one: a. furnace explosion b. tubes rupturing c. a foaming condition occurring d. nuisance shut down - c An opening from a mechanical room where combustion equipment is housed that provides the fresh air required for satisfactory combustion of a fuel is the: Select one: a. combustion air opening b. windbox c. blower d. damper - a A boiler inspection: Select one: a. must be done before the boiler is ready for start-up b. must be done before closing up and filling the boiler c. must be done every two years d. must be done after every shutdown of a boiler - b A tour of the power plant or power plant system to discover adverse conditions prior to starting the plant or plant systems is known as a: Select one: a. shake downb. take down c. write down d. walk down - d
Written for
- Institution
- 4th Class Power Engineering Unit B4: Boiler Plant
- Course
- 4th Class Power Engineering Unit B4: Boiler Plant
Document information
- Uploaded on
- August 12, 2023
- Number of pages
- 48
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
4th class power engineering unit b4 boiler plant
Also available in package deal