Air Assault Phase 1 Homework Study Guide | 2023 | 100 Questions with 100% Correct Answers | Updated & Verified
What is one physical feature used to distinguish between the AH-64A and AH-64D? - The AH-64D has a Fire Control Radar (FCR) located above the Main Rotor system/ or EFAB box on side of AH-64D. What is the cleared diameter of a size 1 landing? - 25 Meters What are the dimensions for additional touchdown point lights at night for utility aircraft? - 5x5m When working with obstacles, what are the four R's? - Remove Reduce Red (Mark it) Radio (advise pilot) Which terrain flight mode is defined as flying as near as possible to the earth's surface with varying speeds and altitudes? - Nap of the earth What is the cleared diameter of a size 5 landing point? - 100 Meters
Written for
- Institution
- Air Assault Phase 1
- Course
- Air Assault Phase 1
Document information
- Uploaded on
- August 11, 2023
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
air assault phase 1 homework study guide
Also available in package deal