ACQ 202 MODULE 3 EXAM : Part III questions with correct answers
Which of the following is NOT one of the methods used to achieve a producible design? - Answer Introduce variability in the manufacturing process. A Fixed-Price Incentive (Firm Target) (FPIF) contract is awarded for $25 million to design a computer based training course for the Air Force with a period of performance of 18 months. What reports, if any, must the Air Force Program Manager (PM) require the contractor provide regarding their cost, schedule, and technical performance? - Answer The contractor would submit an Integrated Program Management Report (IPMR) with formats 1, 5, 6 and 7. In which of situations is early operational testing least likely to be required for non-developmental item (NDI)? - Answer When the NDI will be maintained by the contractor and used in the same environment for which it was designed. Under what condition would contractor logistics support be most appropriate for a non-developmental item (NDI) communications device being acquired by the U.S. Army? - Answer The configuration of the device is expected to change frequently to incorporate technological advances as they become available. Earned Value Management provides a sound basis for (select all the apply): - Answer 1. Estimating probable completion times and costs 2. Taking corrective action. 3. Identifying problems. 4. Re-planning the project, if needed.
Written for
- Institution
- ACQ 202
- Course
- ACQ 202
Document information
- Uploaded on
- June 30, 2023
- Number of pages
- 8
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
acq 202 module 3 exam part iii questions with co
Also available in package deal