NICET Level 1 inspection and Testing (With Complete Solutions)
When using a pulse load tester on a sealed lead acid battery, the minimum acceptable capacity is... correct answers 80% When a software change is made to a fire alarm system, what percentage of the initiating devices not affected by the change must be tested correct answers 10% When testing elevator recall, the elevator should go to the alternate level when: correct answers The lobby smoke detector on the recall level is activated Minimum requirement for system documentation correct answers Battery calculations/floor plan/sequence of operations/voltage drop calculations Carbon monoxide detectors used for the toxicity of gas fired heating equipment must be tested annually per NFPA 72 correct answers False What is the maximum time period to replace a lead acid battery correct answers Per manufacturers recommendation What type of instrument is normally used to test the specific gravity of lead acid battery cells correct answers Hydrometer Requirements of the branch circuit for the fire alarm control panel correct answers Must be identified as fire alarm circuit.....must have a red marking......must be locked in the ON position if its a circuit breaker A ladder must be able to support ....... Times the weight of the anticipated load correct answers 3.3 times Periodic testing records are required to be maintained for? correct answers One year after the next test The term "approved" in NFPA 72 refers to approved by: correct answers The AHJ In areas that are not continually occupied, automatic smoke detection shall be provided at? correct answers Location of the FACP......location of the remote power supplies for notification appliances......supervising station communication equipment NFPA72 recommends this to be specified in the test plan correct answers What is to be tested......how it is to be tested Where monitoring of room temperature is required to detect freezing for a wet pipe sprinkler system, what should the temperature setting? correct answers 40 degrees
Written for
- Institution
- NICET Level 1 inspection and Testing
- Course
- NICET Level 1 inspection and Testing
Document information
- Uploaded on
- June 28, 2023
- Number of pages
- 5
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
when using a pulse load tester on a sealed lead ac
Also available in package deal