CCHT Water| Questions with 100 % correct Answers | Verified
City water entering the facility begins the ____ Pathway - Fluid Optimal temp of incoming water is - 77 The booster pump works together with the captive air tank to ____ - Boost volume of water for use in the facility The "SMART SYSTEM" is a sodium bisulfite injection system aids ____ control and the removal of _____ - pH, Chlorine What is the size of particles removed by the multi-media tanks (sediment filters) - equal of less that 10 microns What do carbon tanks remove - Chlorine and Chloramine Empty bed contact time is defined as - How long water is in contact with carbon AAMI requirements for Empty Bed Contact Time (EBCT) is - 10 min. The purpose of adding chlorine and chloramine to city work is to - Kill Bacteria The process by which chlorine and chloramine is called - Adsorption Prior to testing, the RO must be running for how long - 15 min Allowing the RO to running allows the staff member to collect a ____ simple - Fresh
Written for
- Institution
- CCHT Water
- Course
- CCHT Water
Document information
- Uploaded on
- June 27, 2023
- Number of pages
- 2
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal