Scrum Master Training questions with correct answers
What are two critical areas that differentiate Agile from waterfall development? a. Fast Feedback b. Face-to-Face interaction c. staggered integration d. architectural runway 3. incremental delivery of value - Ans A and E Which statement is true about scrum? a. It is a team-based framework b. It is a set of technical software practices c. It is a Lean System Engineering technique d. It is ideal method for static design requirements - Ans A When does the Plan-do-CA cycle occur in Scrum? a. Across all scrum events b. In the daily stand-up c. As part of the Iteration Retrospective d. At the Iteration Review - Ans A What is the purpose of the Plan-Do-Check-Adjust cycle as applied to iterations? a. To create a continuous flow or work to support the delivery pipeline b. To allow the team to perform some final backlog refinement for upcoming Iteration planning c. To provide a regular predictable developement cadence to produce an increment of value
Written for
- Institution
- PSM I - Professional Scrum Master I
- Course
- PSM I - Professional Scrum Master I
Document information
- Uploaded on
- June 27, 2023
- Number of pages
- 9
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
scrum master training questions with correct answe
Also available in package deal