100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Sled Manufacturing budgeted 10,000 widgets for production during 201

Rating
-
Sold
-
Pages
1
Grade
A
Uploaded on
27-06-2023
Written in
2022/2023

Sled Manufacturing budgeted 10,000 widgets for production during 2012. Sled has capacity to produce 12,000 units. Fixed factory overhead is allocated to production. The following estimated costs were provided: Direct material ($14/unit)$ 140,000 Direct labor ($30/hr. Solution Hi, Part 1 Sales Value (1000*86) = 86000 Variable Cost Direct Material (1000*14) = 14000 Direct Labor (1000*2*30) = 60000 Variable Manu. Overhead (1000*6) = 6000 Contribution = = 6000 (Order should be accepted as it generates an additional margin of $ 6000. Part 2 If produced self = total variable cost = 14 + 60 +6 = 80 If obtained from outside = 78 Fixed cost will have to be incurred in both the cases. Since the cost of procurement from outside is lesser than in-house variable cost, sled should give the order to outside supplier. Thanks, Aman

Show more Read less
Institution
Course








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
June 27, 2023
Number of pages
1
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Sled Manufacturing budgeted 10,000 widgets for production during 2012. Sled has capacity to
produce 12,000 units. Fixed factory overhead is allocated to production. The following estimated
costs were provided: Direct material ($14/unit)$ 140,000 Direct labor ($30/hr.


Solution
Hi, Part 1 Sales Value (1000*86) = 86000 Variable Cost Direct Material
(1000*14) = 14000 Direct Labor (1000*2*30) = 60000 Variable Manu. Overhead (1000*6) =
6000 Contribution = 86000 - 14000 - 60000 - 6000 = 6000 (Order should be accepted as it
generates an additional margin of $ 6000. Part 2 If produced self = total variable cost = 14 +
60 +6 = 80 If obtained from outside = 78 Fixed cost will have to be incurred in both the cases.
Since the cost of procurement from outside is lesser than in-house variable cost, sled should give
the order to outside supplier. Thanks, Aman
$8.36
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
meejuhaszjasmynspe52866

Get to know the seller

Seller avatar
meejuhaszjasmynspe52866 Self
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
2 year
Number of followers
0
Documents
338
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions