DBIA: Principles of Design-Build and Post Award & Contracts questions with correct answers
Miller Act 1935 - Answer Federal Government passed bond requiring payment and performance bonds on all public works, what year? Brooks Bill 1972 - Answer Bill directing A/E's selected on qualifications, what year? Clinger Cohen Act/Defense Procurement Reform Act 1996 - Answer Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. Standard of Care - Answer The level of quality that any average Design Professional would be able to perform given the circumstances. Design Bid Build - Answer Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), Multi Prime - Answer Project Delivery - Many contracts through Owner CM at Risk - Answer Project Delivery method allowing the contractor to come on board very early in design for preconstruction services yet maintains separation between Designer and Builder contractually. Design Build - Answer Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages.
Written for
- Institution
- DBIA
- Course
- DBIA
Document information
- Uploaded on
- June 26, 2023
- Number of pages
- 13
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
dbia principles of design build and post award amp
Also available in package deal