NCP 5.15 (A+ Guaranteed)
An administrator is installing license on a newly created cluster. The cluster is behind a DMZ with no connection to the internet. Which two steps encompass the connect process to install licenses to the cluster? (Choose two) A. Temporally connect the cluster to the internet and follow process in prism. B. Enter the cluster summary file info on a system connected to the internet and download a license file. C. Copy the license file to a USB drive and upload to the cluster. D. Upload the license file downloaded to the cluster. correct answers B y D An administrator wants to view the total IOPs, read & write IOPs on a single graph in prism. Which type of chart on the analysis is capable of allowing this view? A. metric chart B. entity chart C. performance chart D. measurement charts correct answers B Which options are available when live migration is performed on a VM in an AOS 5.5 implementation? A. The VM can be moved on a different host B. the VM can be moved to a different host and a different storage container C. the VM can be moved to a different storage container D. the VM can be moved to a different (remote) site correct answers A An administrator logs into Prism Element goes to the Network view, and see... Which three steps must the administrator take to increase throughput to the host? (Choose three.) A. Connect the 10 Gb interfaces to the physical switch. B. Change the bond mode to balance - slbor balance — tcp. C. Remove any 1Gb interfaces still connected from the default bond. D. Add a new switch to the network and connect 1Gb interfaces to it. E. Change the VLAN ID to a higher priority ID correct answers A, D y E Which 3 VM components can be monitored in the VM dashboard in prism element (choose three)
Written for
- Institution
- NCP 5.15
- Course
- NCP 5.15
Document information
- Uploaded on
- June 19, 2023
- Number of pages
- 17
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
an administrator is installing license on a newly