EPA Model Lead Based Paint Risk Assessor (Questions with complete solutions)
1978 correct answers When did they reduce to Lead Levels in consumer products The underside of a horizontal surface which projects beyond a wall line, such as an overhanging roof. correct answers What is a soffit? False correct answers T/F: The risk assessor should be involved in the process of selecting a contractor. 1. There are big cracks in the walls. 2. Ceiling is leaking in the bathroom and the kitchen. 3. The window wells are in disrepair- and contain paint chips. 4. Right across the street there's a battery recycling shop. correct answers Scenario: You arrive on premises and are scheduled to conduct a visual assessment of the property. Which do you take note of? A risk assessment determines the Lead Hazards and An EBL investigation focus on where the child has been and the cause or causes of exposure. correct answers What's the difference between a risk assessment and an EBL child investigation To determine and report the existence, nature, severity, and location of lead paint hazards and potential remedies correct answers The objective of a Risk Assessment is: A surface by surface investigation for determining the presence and location of lead based paint and report the results correct answers What is the definition of a Lead Inspection: - Condition of paint - various pathways (dust and soil) - Future plans (maintenance and rehabilitation) correct answers A Risk Assessor must consider the following factors in addition to the concentration of lead in paint: A supplement to correct answers A Risk assessment is best described as _________ the approach of lead paint Inspection and Abatement. In good condition correct answers A Lead Hazard screen is a type of Risk assessment that applies to housing that is: - Determining the most appropriate evaluation process and obtaining background information - Conducting the evaluation and determining the actual hazards -Providing guidance toward reducing and eliminating lead hazards and producing a written report correct answers The Risk Assessment process developed by HUD include:
Written for
- Institution
- EPA Lead Risk Assessor
- Course
- EPA Lead Risk Assessor
Document information
- Uploaded on
- May 14, 2023
- Number of pages
- 28
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal