100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
23-03-2023
Written in
2022/2023

ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+ DoD components and contractors use WBSs as a foundation to establish schedules and formulating budgets. True The DoD provides guidance for the development of a standardized WBS. The principal document that describes these structures is derived from which of the following? MIL-STD-881C The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work breakdown structures for defense materiel items." In the document, how many types of systems are covered? 11 eleven What are the common elements of WBSs? integration, assembly, test and checkout; systems engineering; program management; training; data; system test and evaluation; peculiar support equipment; common support equipment; operation and site activation; industrial facilities; initial spares and repair parts. Which of the following is referred to as the "product part" of a WBS? system elements The common elements of a WBS are elements common to all acquisition programs developed by the DoD. Common elements can be found at all levels of a WBS. They are the actual configuration items of the system, and enable the realization of the system. false; common elements can be found at all levels of a WBS. They are the enabler for the system realization. They are applicable to all major systems and subsystems as needed. They are NOT the actual configuration items of the system, but elements that enable the realization of the system. Program WBS is controlled and maintained by? program management office PMO Contract WBS is controlled and maintained by? the contractor WBS Level 3 elements are subordinate elements of each Level 2 major element. Which of the following are identified as level 3 elements? fire control type of service; technical publication The Program WBS has 3 levels; what are they and what do they cover? Level 1 is the entire aircraft system; Level 2 covers the prime mission products including the aircraft system hardware and software and includes the aggregations of system-level services such as program management, system engineering, and test and evaluation. Level 3 consists of the subordinate elements of each of the major elements of level 2. Contract WBS defines that part of the program that is being produced by a given contractor and is the basis for collecting cost and schedule data for the contract. True Which of the following are the levels included in the Program WBS? Level 1; Level 3 (Level 1 is the overall project; level 2 is the major elements; and level 3 refers to the subordinate elements of Level 2.) What are the two types of WBS? Program & Contract What is the Control Account Manager CAM responsible for? The CAM is responsible for allocating resources and planning schedules to accomplish the tasks within a control account (associated with an element of the WBS); work/planning packages the CAM develops within their control account become part of the Integrated Master Schedule (IMS) and the Performance Measurement Baseline (PMB). WBS plays a significant role in which of the following? The WBS plays a significant role in planning and assigning management and technical responsibilities; monitoring and controlling the progress and status of engineering efforts, resource allocations, cost estimates, expenditures, and cost and technical performance. The WBS provides a consistent and visible framework for materiel items and contracts within a program throughout its life cycle. True The Program WBS covers the acquisition of a specific defense materiel item. True The Contract WBS begins at what level? Level 4 What is a tool used to identify issues and concerns and to reduce risk? Work Breakdown Structure WBS This person or organization develops and controls the program levels 1-3 of the WBS. The Program Management Office PMO A Project Manager PM uses this to help with cost, schedule, performance and risk management? WBS Missile and Space Systems are covered in this document? MIL-STD_881C The MIL-STD_881C serves this purpose? It describes the DoD's standardized WBS structure. Its goal is to define the relationship among all program elements? The WBS in relation to the Acquisition Life Cycle Level 4 marks the beginning of this level? Contract Level This is used to organize the breakdown of work into small areas and parts? WBS This is prepared and maintained by the contractor? Contract WBS What type of WBS is prepared and maintained by the government? Program A work breakdown structure WBS can be used to help the manager: Stay within budget by identifying and analyzing tradeoffs

Show more Read less
Institution
ACQ 101
Course
ACQ 101









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACQ 101
Course
ACQ 101

Document information

Uploaded on
March 23, 2023
Number of pages
5
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BrilliantScores Chamberlain College Of Nursng
View profile
Follow You need to be logged in order to follow users or courses
Sold
2822
Member since
3 year
Number of followers
2233
Documents
16100
Last sold
2 days ago
latest updated documents, correct, verified & graded A study materials

get bundles, documents, test banks, case studies, shadow health's, ATIs, HESIs, study guides, summary, assignments & every kind of study materials.

3.8

774 reviews

5
388
4
117
3
116
2
37
1
116

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions