100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

QSP Exam questions with correct answers

Rating
4.0
(3)
Sold
8
Pages
12
Grade
A+
Uploaded on
26-02-2023
Written in
2022/2023

When does the CGP apply? CORRECT ANSWER Any construction or demolition of one acre or more Activities under the CGP include: a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. b. Disturbances to land surfaces solely related to agricultural operations. c. Clearing and grading 2 acres of land d. Discharges of storm water from areas on tribal lands. CORRECT ANSWER C TRUE OR FALSE: if construction of an LUP will occur across several properties, the utility company, municipality, or other public/private company/agency that owns or operates the LUP project is responsible for obtaining coverage CORRECT ANSWER True Risk Level 2 monitoring requirements include: a. Effluent sampling where applicable b. Sampling for pH and turbidity c. Sampling for pH, turbidity, and suspended sediments CORRECT ANSWER B All NAL data must be uploaded within ___ after NAL exceedance has been identified a. 24 hours b. 1 week c. 10 days d. 2 weeks CORRECT ANSWER C Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity? a. Qualified SWPPP Developer (QSD)

Show more Read less
Institution
QSP - Qualified SWPPP Practitioner
Course
QSP - Qualified SWPPP Practitioner









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
QSP - Qualified SWPPP Practitioner
Course
QSP - Qualified SWPPP Practitioner

Document information

Uploaded on
February 26, 2023
Number of pages
12
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • hydraulic cap

Content preview

QSP Exam questions with correct answers
When does the CGP apply? CORRECT ANSWER Any construction or demolition of one acre or more
Activities under the CGP include: a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural operations.
c. Clearing and grading 2 acres of land
d. Discharges of storm water from areas on tribal lands. CORRECT ANSWER C
TRUE OR FALSE: if construction of an LUP will occur across several properties, the utility company, municipality, or other public/private company/agency that owns or operates the LUP project is responsible for obtaining coverage CORRECT ANSWER True
Risk Level 2 monitoring requirements include:
a. Effluent sampling where applicable
b. Sampling for pH and turbidity
c. Sampling for pH, turbidity, and suspended sediments CORRECT ANSWER B
All NAL data must be uploaded within ___ after NAL exceedance has been identified
a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks CORRECT ANSWER C
Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity? a. Qualified SWPPP Developer (QSD)
b. Legally Responsible Person (LRP) or the LRP's Approved Signatory
c. Qualified SWPPP Practitioner (QSP)
d. The CEO CORRECT ANSWER B
Which regulation establishes a framework for regulating municipal and industrial storm water discharges to waters of the United States:
a. Clean Water Act (CWA)
b. Porter-Cologne Water Quality Control Act
c. Endangered Species Act
d. U.S. Environmental Protection Agency (USEPA)
e. California Environmental Quality Act (CEQA) CORRECT ANSWER A
Certain non-storm water discharges may be necessary for the completion of construction projects. Therefore, the General Permit authorizes such discharges provided they meet the following conditions except: a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance CORRECT ANSWER E
When possible, use erosion controls as the ___ protection, with sediment controls as a ___system.
a. primary, secondary
b. secondary, primary CORRECT ANSWER A
A temporary or permanent structural BMP that directs concentrated flows away from disturbed
areas and prevents erosion is...

Reviews from verified buyers

Showing all 3 reviews
1 year ago

1 year ago

2 year ago

4.0

3 reviews

5
1
4
1
3
1
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2013
Member since
3 year
Number of followers
1342
Documents
46921
Last sold
1 day ago
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

368 reviews

5
162
4
84
3
51
2
22
1
49

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions