Army Explosives Safety Site Planning (Cert) Exam with 100% Correct Answers 2023
Army Explosives Safety Site Planning (Cert) Exam with 100% Correct Answers 2023 USATCES has submitted your ESSP for final approval. Who did they submit to? - Correct answer-DDESB What is the minimum distance permitted between an A&E location and the installation headquarters building? - Correct answer-Inhabited Building Distance (IBD) What is the minimum distance permitted between a PES and an interstate highway? - Correct answer-Public Traffic Route Distance (PTRD) What is the minimum distance permitted between any two operating buildings and sites within an operating line? - Correct answer-Intraline Distance (ILD) What is the minimum distance permitted between an earth-covered magazine and a nearby above-ground magazine? - Correct answer-Intermagazine Distance (IMD) What do you call the collection of documents that identifies the relationship between a PES and any facilities or personnel who may be exposed to the PES? - Correct answerESSP Your installation is putting a new roof on an existing PES facility. Do you need to complete an ESSP? - Correct answer-No, this type of change does not require one Your installation is changing the NEW of an existing facility and will be storing a hazard division not previously approved in it. Do you need to complete an ESSP? - Correct answer-Yes, and it must be approved by the DDESB Which of the following is a phase of the ESSP process? - Correct answer-Development and Evaluation How many ESSP categories are there? - Correct answer-Five how must the ESSP package be submitted? - Correct answer-Electronically Which three items are in the Maps and Drawings section of an ESSP package? - Correct answer-Facilities maps Installation maps Site maps Which three items are included in the Evaluations section of an ESSP package? - Correct answer-Electrical installation Lightning protection information Glass hazard risk assessment What part of the ESSP package contains background information, site location, and reason for the ESSP? - Correct answer-ESSP narrative Who has ultimate approval authority for an ESSP? - Correct answer-DoD explosives Safety Board (DDESB) The purpose of an Expedited Approval Request is to - Correct answer-Justify why an expedited approval is required Which four items are required on installation maps? - Correct answer-Installation boundaries Roads and railways Waterways and ponds Facilities and associated utilities Which of these is a site map requirement? - Correct answer-Scale 1 in = 400 ft Which four items are required parts of the Transmittal Memorandum? - Correct answerApplicable explosives safety references Site location Requested approve by date Point of contact (POC) for the ESSP Which three mistakes commonly occur when submitting an ESSP? - Correct answersubmitting a map without an indication of true north Leaving out the lightning protection system (LPS) drawings Sending a map with no scale indicated The purpose of an ESSP is to ensure safety, provide specifications, and - Correct answer-establish limits ILD is the minimum distance permitted between - Correct answer-two operating buildings Your installations is refurbishing an existing PES facility. Do you need to complete an ESSP? - Correct answer-Yes, and it requires DDESB approval. You must submit an ESSP for DDESB approval if the installation is - Correct answerBuilding an ES within an existing ESQD arc Who must accept identified risks? - Correct answer-Installation Commander Failing to submit a successful ESSP can result in impaired operational capability, decreased production, and - Correct answer-delay in construction Which part of the ESSP package contains background information, site location, and the reason for ESSP submission? - Correct answer-ESSP narrative All of these are requirements of an ESSP except? - Correct answer-Tenant unit approval Which of these requirement must appear on a site map? - Correct answer-Scale 1 in =400 ft What part of an ESSP package contains blast hazards, fragment hazards, and the glass hazard risk assessment? - Correct answer-Evaluations You must submit the ESSP package - Correct answer-Electronically through secure command channels. Who is responsible for conducting an Army-level review of the ESSP? - Correct answerUSATCES Who is authorized to sign an ESSP transmittal memorandum? - Correct answerInstallation Commander or designated representative Which mistake is commonly made when submitting an ESSP? - Correct answerSubmitting a map without an indication of true north
Written for
- Institution
- Army Explosives Safety
- Course
- Army Explosives Safety
Document information
- Uploaded on
- February 6, 2023
- Number of pages
- 3
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- army explosives safety
- army explosives
-
army explosives safety site planning cert exam with 100 correct answers 2023
-
army explosives safety site planning cert exam
-
usatces has submitted your essp
Also available in package deal