Army Explosive Safety Site Planning Exam with 100% Correct Answers 2023
Army Explosive Safety Site Planning Exam with 100% Correct Answers 2023 A collection of documents used to identify the relationship between a PES and any facilities or personnel who may be exposed tp the PES is called? - Correct answerESQD When would you have to submit an ESSP? - Correct answer-build an ES within an existing ESQD arc, new mission requires construction of a new PES, commander wants to physically change an above-ground magazine what is not required in order to not submit an ESSP? - Correct answer-contingency operation, storage of HD 1.4S only, What evaluations need to be included in a ESSP package? - Correct answer-protective construction, off-installation impact, magazine content, fragment hazard, glass hazard risk assessment, electrical installation, blast hazard, natural or man-made features (barricades) transmittal memorandum must include? - Correct answer-commander signature, POC, site location, requested approve-by date what must a site map include? - Correct answer-waterways, ESQD arc, installation boundaries, traffic and railroads, facilities (ex. flight lines, ponds), 1:400 scale, north orientation Who signs the ESSP transmittal memorandum? - Correct answer-installation commander If the facility doesn't have a LSP, what needs to be submitted? - Correct answercommand acceptance of risk, acceptance of potential assets losses, no fire hazards exist you have to ensure the installation map shows - Correct answer-facilities and associated utilities, installation boundaries, roads and railroads, waterways, other buildings What are common mistakes on ESSP? - Correct answer-sending a map with no scale, sending ESSP to USATCES, submitting a map with no true North IMD - Correct answer-minimum distance between an AGM and ECM ILD - Correct answer-minimum distance between two operating building PES - Correct answer-minimum distance between a busy street and PES IBD - Correct answer-minimum distance between ammo storage and housing area The Expedited Approval Request must -
Written for
- Institution
- Army Explosive Safety
- Course
- Army Explosive Safety
Document information
- Uploaded on
- February 6, 2023
- Number of pages
- 2
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- army explosive
-
army explosive safety site planning exam with 100 correct answers 2023
-
army explosive safety site planning exam
-
army explosive safety site
-
a collection of documents used to identify th
Also available in package deal