Summary of all lectures from the course 1CV50 and chapters 7, 8, and 9 from the book Factory Physics from Hopp and Spearman.

Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Institution
Study
Course

Document information

Summarized whole book?
No
Which chapters are summarized?
Hoofdstuk 7 t/m 9
Uploaded on
February 5, 2023
Number of pages
9
Written in
2021/2022
Type
Summary

Subjects

Content preview

Summary 1CV50
MANUFACTURING INTEGRATION COURSE




Written for college year 2021-2022

, Chapter 7
A manufacturing system is a goal-oriented network of processes through which parts flow. A plant is made up
of lines which in turn are made up of processes.

Throughput (TH): average quantity of good parts produced per time unit in a line.
Cycle time (CT): time the part spends as WIP
Lead time: time assigned for production of a part on a certain line
Service level: 𝑃(𝐶𝑇 ≤ lead time)
Fill rate: fraction of orders filled from stock
Turnover ratio: ratio of throughput to average inventory
Internal benchmarking: comparisons made inside systems
External benchmarking: comparisons made against outside systems

Parameters:
• 𝝀: arrival rate per time unit
• 𝒎𝒊: number of parallel identical machines at workstation 𝑊𝑖
• 𝒕𝒊𝟎 : raw process time of a machine in workstation 𝑊𝑖
• 𝜹𝒊 : throughput of workstation 𝑊𝑖
• 𝝋: average flow time in the system

Capacity:
• Upper limit on the throughput
𝑚𝑖
• Capacity =
𝑡0𝑖


Little’s law:
• Work in progress 𝑊𝐼𝑃 = 𝑇𝐻 × 𝐶𝑇
o 𝒘: average WIP level in the system
o So, 𝑤 = 𝛿𝜑
• Finished goods inventory 𝐹𝐺𝐼 = 𝑛 × 𝑇𝐻 with 𝑛 the planned inventory time.

Utilization: fraction of time a machine is not idle
𝛿𝑖 𝑡0𝑖
• 𝑢𝑖 = 𝑚𝑖
<1

Descriptors of a line:
• 𝒓𝒃 (bottleneck rate): capacity of the whole line
• 𝑻𝟎 (raw process time): sum of the long-term average process times of each station in the line
• Critical WIP (𝑾𝟎): WIP level in which a line without congestion achieves max TH and min CT
o 𝑊0 = 𝑟𝑏 𝑇0
o Critical WIP cannot exceed the nr of machines 𝑚.
▪ Balanced line: 𝑊0 = 𝑚
▪ Unbalanced line: 𝑊0 ≤ 𝑚
• 𝜶: congestion coefficient
o 𝛼 = 0: no variability, best case
o 𝛼 = 1: practical worst case
o 𝛼 = 0: worst possible case

Balanced line: all stations in a line have the same capacity
Ample equipment: processing is never blocked by lack of equipment
CONWIP: constant WIP meaning that the nr of parts in a line is kept at a constant level.

1
$7.80
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
jonirensen00

Get to know the seller

Seller avatar
jonirensen00 Technische Universiteit Eindhoven
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
4 year
Number of followers
0
Documents
2
Last sold
2 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions