20. Crane Safety Test_ OSHA 30 Construction (winter 23)
20. Crane Safety Test_ OSHA 30 Construction (winter 23) Which of the following is an employer requirement regarding crane safety? If a crane contacts a power line, the operator should normally stay in the cab until power has been de-energized. Standards for crane safety can be found in: - Load charts must: - Load chart ratings will differ when: - Tag lines are quite hard to put into place. Cranes must maintain a minimum of ______ feet away from power lines: For an overhead load exposure, riggers must _______, if operator cannot. Lattice sections cannot be added or removed on truck mounted boom cranes. Which type of crane is known as a "Conventional Crane": Which of the following is NEVER true of Rough Terrain Cranes: You must assure your crane is stable by each of the following EXCEPT: Above the heavy line crossing the load chart are values for failure in: - Which crane type typically has the highest combined capacity for reach and weight: - Which crane has the ability to be "jacked-up" as needed? - Each of the following is true of extra pads for outriggers EXCEPT: Reeving cable through the sheaves on a main block: Side loading the boom-- a potential cause of boom failure-- can occur when: - The headache ball and hook are attached to the whip line by a wedge socket. - Each of the following is true of anti-two block devices EXCEPT: - A short lattice boom: - A truck mounted crane with a Hydraulic boom: - Each of the following is true for lattice booms EXCEPT: - Lattice sections cannot be added or removed on truck boom cranes. - The counterweight swing area of crawler crane must be flagged off if there is any possibility of employee injuries from being hit or pinched between the counterweights. - Crawler Cranes can operate at _______ degrees. - Being ______ is critical for long booms on Crawler Cranes. - Above the heavy line crossing the load chart are values for failures in: - On-board computers will do each of the following EXCPET: - A critical lift is one exceeding _____% on the load chart value. - Load chart values can pinpoint failures of: - Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? - Under OSHA construction requirements for crane and derricks, when a crane operator is employed by a company, who must pay for the crane operator's certification fees? - Certain inspections of crane equipment may be made by a(n) _________ person; however, crane inspections are typically required to be made by a(n) _________ person. - After safety-related modifications have been made to crane equipment, the equipment must be inspected by _______ prior to use. DO NOT preform maintenance on a conveyor until: - Hoists should be inspected: Daily inspections need to include: Hoists shall be: Inspections of hoists should include:
Written for
- Institution
- OSHA 30 Construction 20. Crane Safety
- Course
- OSHA 30 Construction 20. Crane Safety
Document information
- Uploaded on
- February 3, 2023
- Number of pages
- 3
- Written in
- 2022/2023
- Type
- Other
- Person
- Unknown
Subjects
- osha 30 construction
-
crane safety test osha 30 test
-
20 crane safety test osha 30 construction
-
which of the following is an employer requirement regarding crane safety
-
if a crane contacts a power l