NCIDQ Practice Exam Questions – IDPX (correctly answered)
NCIDQ Practice Exam Questions – IDPX (correctly answered)Which event triggers the issuance of a certificate of occupancy? A. Construction work is complete except for fire alarm testing. B. The contractor sends you a pay request for 100% complete work. C. The owner wants to move into part of the space before the rest is finished. D. The city inspector has inspected and finalized the job. Answer: D What factors are MOST important in determining the locations of individual workstations within departments? A. Planning and design concepts B. Company image and employee status C. Work relationships and job adjacencies D. Client's business and communication patterns Answer: C In which situation should you use a construction change directive? A. To request an electrical contractor not listed by the contractor in the bid [tender] documents B. To request pricing for an additional receptacle per the client's request C. To provide additional dimensions to the contractor regarding a receptacle location D. To relocate an electrical receptacle because of revised furniture plans Answer: D Why are addenda issued? A. To provide additional information not included in the bid package B. To inform potential bidders about acceptable alternates C. To obtain additional information D. To request a change during construction Answer: A Which light and color characteristic would be MOST effective to enhance way-finding in a senior living facility? A. Brightness B. Hue C. Contrast D. Saturation Answer: C What portion of a contract typically outlines the designer's responsibilities to the client? A. Scope of services B. Project description C. Terms and conditions D. Compensation schedule Answer: A Your client has a very limited budget for design services, and the scope of the project warrants mechanical and electrical engineering specification. What should you do? A. Reduce your scope to reduce the fee, and contract with a mechanical/electrical engineer for an outline specification. B. Recommend that the client work with a contractor to provide design-build services for mechanical/electrical work. C. Request that the client contract directly with a mechanical/electrical engineer for limited services to review your drawings. D. Insist that your client increase the design budget to cover the necessary mechanical/electrical design services. Answer: B Why is it necessary to indicate the placement of the proposed elevator and stairway in a preliminary plan? A. To ensure an acceptable location to meet all codes B. To verify the client's budget constraints C. To establish the structural support work required D. To ensure accessibility and visibility to visitors Answer: A In which space is emergency lighting REQUIRED? A. Elevators B. Private offices C. Egress corridors D. Restrooms Answer: C After construction on a project has begun, the client asks you to change the wallcovering originally specified to one that does not meet current code requirements. Which of the following is your BEST course of action? A. Research available products that are similar to the requested product and meet the code requirements. Present the options to the client for approval. B. Write a letter to the client stating that the change is against your professional recommendation and that you will make the change but assume no liability. C. Write a letter to the client explaining that you will not make the requested change. D. Tell the client that you will remove the wallcovering from the project and that the client may select and install a different product after your work is completed. Answer: A How do you ensure that all signage on a construction project will be installed in the correct locations? A. Plan to be on site during installation of the signage, and specify where each sign will be placed. B. Require the signage vendor to provide detailed specifications. C. Provide a detailed takeoff along with a floor plan for installation. D. Schedule a meeting for the client or building owner to specify where signage will be placed. Answer: C What aspect of working drawings can lead to problems during construction? A. Proprietary finishes B. Too much information C. Too many sheets of details D. Duplicated details Answer: D Which of the following has the GREATEST impact on the effectiveness of an HVAC system? A. Rooftop chiller size B. Wall insulation type C. Window treatments D. Occupancy load Answer: D In a legal dispute between a client and a designer, a letter of agreement is considered: A. negotiable. B. nonnegotiable. C. legally binding. D. binding following arbitration. Answer: C You have designed a small auditorium for an office building with access from the seating area to the stage to permit wheelchair access to the stage without leaving the auditorium. Your client wishes to remove the wheelchair access. How should you proceed? A. Write a letter advising the client that ADA guidelines are being violated against your advice, and place a copy of the letter in the job file. B. Inform the building department that you are not being permitted to design in compliance with ADA guidelines. C. Inform the client that you will be terminating work on this portion of the project until the issue can be resolved by arbitration. D. Accept the client's position and redesign the auditorium as directed Answer: A
Written for
- Institution
- IDPX
- Course
- IDPX
Document information
- Uploaded on
- December 1, 2022
- Number of pages
- 4
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ncidq practice exam questions – idpx correctly answered
-
which event triggers the issuance of a certificate of occupancy a construction work is complete except for fire alarm testing b the contra
Also available in package deal