BUS 375 FINAL EXAM PART 1 QUESTIONS WITH COMPLETE SOLUTIONS
Question 1 4 out of 4 points Which of the following schedule compression techniques is often the lowest risk and with the added benefit of lowering the cost? Answer Selected Answer: Descoping Correct Answer: Descopin g Question 2 4 out of 4 points If the optimistic time for an activity is 6 weeks, the pessimistic time is 24 weeks and the most likely time is 12 weeks, then the expected duration is: Answer BUS 375 FINAL EXAM PART 1 QUESTIONS WITH COMPLETE SOLUTIONS Selected Answer: 13 weeks Correct Answer: 13 weeks Question 3 4 out of 4 points An activity in a network has the following characteristics: ES = 5, EF = 9 and LF = 12. LS = _____. Answer Selected Answer: 8 Correct Answer: 8 Question 4 4 out of 4 points Which of the following network diagramming methods do not use dummy activities? Answer Selected Answer: PDM Correct Answer: PD M Question 5 4 out of 4 points Smoothing out project resources from period to period is called Answer Selected Answer: Resource leveling Correct Answer: Resource
Written for
- Institution
-
Strayer University
- Course
-
BUS 375
Document information
- Uploaded on
- November 23, 2022
- Number of pages
- 28
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
bus 375 final exam part 1 questions with complete solutions