What decision authorizes entry into the Production and Deployment phase?
Answer: Milestone C decision
Before a project enters the TMRR phase, the AoA must be completed and the Acquisition Strategy (AS) is approved by the MDA.
Answer: True
The Acquisition Strategy (AS) is:
Answer: Prepared by the Program Manager (PM) during the Materiel Solution Analysis Phase (MSA) and is submitted
to the Milestone Decision Authority (MDA) at Milestone A
When is the Acquisition Program baseline (APB) prepared?
Answer: Prepared at program initiation and revised to subsequent milestone reviews, program restructuring, or unrecoverable deviations
What authorizes entry into the Engineering and Manufacturing Development (EMD) phase?
Answer: Milestone B decision
What authorizes entry into the Production and Deployment phase?
Answer: Milestone C decision
What are the major efforts of the Operations and Support phase?
Answer: Life Cycle Sustainment and Disposal
DoD defines and validates requirements through the Joint Capabilities Integration and Development System (JCIDS) and develops technology, produces weapons systems, and
provides logistics support through the Major Capability Acquisition pathway.
Answer: True
The Office of the Under Secretary of Defense (A&S) asks the Director, International Cooperation (A&S IC), Defense Advanced Research Projects Agency (DARPA) and the Military Departments to identify and pursue cooperative opportunities in an emerging technology area on a global basis to enhance our coalition capabilities. This initiative supports the achievement of which DoD Security Cooperation objective?
Answer: International Armaments CooperationThis study source was downloaded by 100000812546443 from CourseHero.com on 11-21-2022 16:26:11 GMT -06:00