CPIM PART 2 PRACTICE EXAM QUESTIONS AND ANSWERS which of the following is the most appropriate first step in a significant organizational change? - establishing a sense of urgency that changes needed which of the following actions is most effective when load chronically exceeds average capacity - revising the master schedule continuous production processes would be most appropriate for which of the following - generation of electric power a plant refines a raw material until a bulk liquid chemical using a highly automated production process. which of the following would be the most appropriate operational unit of measure for capacity and load in this situation - gallons of the bulk chemical which of the following data elements is required to backward schedule work orders for component parts in a push production environment - current backlog for required work centers

Show more Read less
Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
July 19, 2022
Number of pages
14
Written in
2021/2022
Type
Exam (elaborations)
Contains
Unknown

Subjects

Content preview

CPIM PART 2 PRACTICE EXAM QUESTIONS AND ANSWERS

which of the following is the most appropriate first step in a significant organizational
change? - establishing a sense of urgency that changes needed

which of the following actions is most effective when load chronically exceeds average
capacity - revising the master schedule

continuous production processes would be most appropriate for which of the following -
generation of electric power

a plant refines a raw material until a bulk liquid chemical using a highly automated
production process. which of the following would be the most appropriate operational
unit of measure for capacity and load in this situation - gallons of the bulk chemical

which of the following data elements is required to backward schedule work orders for
component parts in a push production environment - current backlog for required work
centers

fail safe work methods include which of the following activities - installing poka -yoke

distribution requirements planning provides direct input into which of the following
functions in the manufacturing planning and control system - Master production
scheduling

a company uses centralized planning at the manufacturing site for distribution system
replenishment decisions. how is the reorder point typically established for this type of
planning - when the projected available balance for a future given period is negative or
below the safety stock level

a company competes in an industry that serves other manufacturers. their customers
play a significant role in defining requirements, and most products have a 7 to 10 year
life. what is the most likely advantage a company in this industry would realize from
having a fast product and service design process - it can delay start of design and still
meet the demand

the five forces model - considers the impact of buyers on competition

all of the following activities focus on promoting supply chain efficiencies except -
building in redundancies

module 4, section f, topic 6

a company's competitive approach in product offerings to fit specific market conditions
in each host country would be an example of - a localized multi country strategy

, module 1 section c topic 2

which of the following inventory evaluation methods best measures falling cost -
standard cost

module 3 section A topic 3

objectives of the detailed capacity requirements planning process include all the
following except - determination of the materials needed to make the products in the
master production schedule
explanation: The role of planning the materials to build parents and sub-assemblies
belongs to the material requirements planning process, not the capacity planning
process

module 3 section F topic 2

in an emerging market for a new product, financially strong companies post which of the
following risk to initial front runners - acquiring operations of weaker competitors

module 1 section c topic 2

what is a lean kaizen event - rapid improvement of a limited process area, for example,
a production cell, with the objective of eliminating non-value added work

module 4 section f topic 4

which manufacturing system is characterized by the emergence of standard designs,
price competition, and importance of processed development. it is in which stage of the
life cycle - growth

module 1 section b topic 2

a master production schedule should be loaded to a level that is - no greater than can
be realistically produced

module 2 section g topic 1

a planner has reviewed a planned order for 100 units and released it for 90 units due to
a shortage for one component. The order would appear in the material or requirements
planning grid is which of the following after the release - scheduled receipt

module 3 section d topic 2

improvement programs in a manufacturing company have increased efficiency 10% and
utilization 5%. what is the effect on theoretical capacity - it remains constant
$14.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
smartzone Liberty University
Follow You need to be logged in order to follow users or courses
Sold
3183
Member since
5 year
Number of followers
2292
Documents
14288
Last sold
20 hours ago
AMAIZING EDUCATION WORLD

GET ALL KIND OF EXAMS ON THIS PAGE ,COMPLETE TEST BANKS,SUMMARIES,STUDY GUIDES,PROJECT PAPERS,ASSIGNMENTS,CASE STUDIES, YOU CAN ALSO COMMUNICATE WITH THE SELLER FOR ANY PRE-ORDER,ORDER AND ETC.

3.7

585 reviews

5
261
4
93
3
103
2
29
1
99

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions