Test 1
1. When creating an OBSL work order, the 4 low priority list item is selected. Correct
answer- b. FALSE
2. When a change is made to the OBSL BOM, a new XML file is received into GCSS-
Army via the ______, which results in an update to the existing OBSL BOM. Correct
answer- d. SAP Business Workplace
3. The Open Web Service (OWS)/Universal Data Exchange (UDEx) Interface links
information from the ______ to GCSS-Army. Correct answer- b. Logistics Support
Vessel (LSV)
4. When installing equipment a(n) _____notification must be created. Correct answer- b.
D1 Notification
5. The intent of the OBSL work order is to be able to compare the OBSL material
requirement quantities with the ______. Correct answer- a. On-hand material quantities
6. The nomenclature for the OBSL work order description is the OBSL, followed by the
watercraft vessel ______. Correct answer- c. Advanced Shipment Notification (ASN)
Number
7. True or False? The OBSL work order is not to be released. Correct answer- a. TRUE
8. The OBSL work order that is created for a watercraft mission is used for material
replenishment. Correct answer- b. FALSE
9. The ______ is used to view the provisional on-hand material quantities. Correct
answer- b. BOM History (ZBOMHIST)
10. True or False? The Material Situation Report (/ISDFPS/DISP_MAT_SIT) is used to
establish and to manage the provisional safety stock requirements. Correct answer- a.
TRUE
11. The ______ transaction is used to create the OBSL/On-Hand Material Quantities
spreadsheet. Correct answer- d. Equipment Status Report (Z_EQUST)
12. The ______ transaction is used to display the open watercraft OBSL work order.
Correct answer- a. Equipment Situation Report (/ISDFPS/DISP_EQU_SIT)