Module Code & Module Title
CS6P05NI Final Year Project
Assessment Weightage & Type
25% FYP Interim Report
Semester
2020 Autumn
Student Name: Sanjaya Shrestha
London Met ID: 18029605
College ID: NP01CP4A180031
Internal Supervisor: Ujjwal Subedi
External Supervisor: Sudip Tiwari Bishwarkarma
Assignment Due Date: 25th December 2020
Assignment Submission Date: 24th December 2020
Word Count (Where Required): 3849
I confirm that I understand my coursework needs to be submitted online via Google Classroom under the relevant
module page before the deadline in order for my assignment to be accepted and marked. I am fully aware that late
submissions will be treated as non-submission and a mark of zero will be awarded.
,CS6P05NI Project
Abstract
This project shows the progress of the project up to date. The report starts with mentions
of the features that will be in the system. Brief summary of aims, objective and comparison of
similar applications which are already available. All the diagrams of use cases, DFD, ERD and
class diagrams are kept.
The progress is compared with the Gantt chart and what are the work done shown in the
Gantt chart and what tasks are yet needed to do to complete them accordingly to the Gantt chart.
18029605 Sanjaya Shrestha
,CS6P05NI Project
Table of Contents
1. Introduction 1
1.1. Problem Scenario 2
1.2. Project as a solution 3
1.3. Aims and objectives 4
1.4. Web application features 5
1.5. Report structure 7
2. Background/Literature review 9
2.1. Technology used 9
2.2. Methodology 9
2.3. Review of similar projects 12
2.4. Comparison of table 15
2.5. Analysis of similar projects with my project 16
3. Development to date 16
3.1. Web application 17
3.1.1. System architecture 17
3.1.2. Use case diagram 18
3.1.3. High level use case description 19
3.1.4. Wireframe 25
3.1.5. Context diagram 32
18029605 Sanjaya Shrestha
, CS6P05NI Project
3.1.6. DFD level 1 33
3.1.7. Activity diagram 34
3.2. Entity relationship diagram (ER diagram) 38
3.3. Class diagram 39
3.4. Gantt Chart 40
4. Analysis of progress 41
5. Future work 42
References 43
18029605 Sanjaya Shrestha
CS6P05NI Final Year Project
Assessment Weightage & Type
25% FYP Interim Report
Semester
2020 Autumn
Student Name: Sanjaya Shrestha
London Met ID: 18029605
College ID: NP01CP4A180031
Internal Supervisor: Ujjwal Subedi
External Supervisor: Sudip Tiwari Bishwarkarma
Assignment Due Date: 25th December 2020
Assignment Submission Date: 24th December 2020
Word Count (Where Required): 3849
I confirm that I understand my coursework needs to be submitted online via Google Classroom under the relevant
module page before the deadline in order for my assignment to be accepted and marked. I am fully aware that late
submissions will be treated as non-submission and a mark of zero will be awarded.
,CS6P05NI Project
Abstract
This project shows the progress of the project up to date. The report starts with mentions
of the features that will be in the system. Brief summary of aims, objective and comparison of
similar applications which are already available. All the diagrams of use cases, DFD, ERD and
class diagrams are kept.
The progress is compared with the Gantt chart and what are the work done shown in the
Gantt chart and what tasks are yet needed to do to complete them accordingly to the Gantt chart.
18029605 Sanjaya Shrestha
,CS6P05NI Project
Table of Contents
1. Introduction 1
1.1. Problem Scenario 2
1.2. Project as a solution 3
1.3. Aims and objectives 4
1.4. Web application features 5
1.5. Report structure 7
2. Background/Literature review 9
2.1. Technology used 9
2.2. Methodology 9
2.3. Review of similar projects 12
2.4. Comparison of table 15
2.5. Analysis of similar projects with my project 16
3. Development to date 16
3.1. Web application 17
3.1.1. System architecture 17
3.1.2. Use case diagram 18
3.1.3. High level use case description 19
3.1.4. Wireframe 25
3.1.5. Context diagram 32
18029605 Sanjaya Shrestha
, CS6P05NI Project
3.1.6. DFD level 1 33
3.1.7. Activity diagram 34
3.2. Entity relationship diagram (ER diagram) 38
3.3. Class diagram 39
3.4. Gantt Chart 40
4. Analysis of progress 41
5. Future work 42
References 43
18029605 Sanjaya Shrestha