100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Other

frustration tutorial work

Rating
-
Sold
-
Pages
2
Uploaded on
18-06-2021
Written in
2020/2021

detailed, descriptive tutorial work to help improve grades and save time for law students

Institution
Course

Content preview

1. What is the common law doctrine of frustration?
unforeseeable event that occurs after the contract that brings a contract to end by no
fault of the parties
makes performance impossible/illegal/something very different

comes from davis contractors ltd v fareham – where doctrine comes from

as long as it is not impossible – court reluctant to frustrate

2. What events can frustrate a contract?
Destruction of subject matter – taylor v Caldwell

Death [cutter v powell] /being pulled to military services [morgan]

Failure of source [Howell v Coupland]

Government intervention – polish v English company case [fibrosa], Tamplin steamship – gov
intervention if it lasts long can frustrate contract

common purpose not available – krell v henry contrast with herne bay steamboat v hutton

Method of performance – bar is high [cases about canal]

unavailability of subject matter – will frustrate, depending on duration of unavailable – bp
v hunt [oil that bp had extracted from hunt], strike might frustrate contract [nema],
Jackson case [in terms of duration]
Need to look at nature of duration – look at cases and see which one it matches before
making assumption

If situation falls into more than one category – then analyse both situations

2. Are there any limitations on the doctrine of frustration?
Impracticality
imprudent bargains – taylor v caldwell, bad deal was not enough

Foreseeable when contract made
By normal intelligent people
Was foreseen by parties but didn’t place it in contract – Walton Harvey v walker

Express provision in contract

Self-induced frustration
Parties cause event that render contract impossible
Parties did something so that they are unavailable to do obligation – super servant 2,
maritime national fish ltd v ocean trawlers

force majeure clause

leases – only because of national carriers’ ltd case – limitation if duration not long enough

3. What is the effect of frustration on a contract at common law? Less relevant
Under common law, if received small amount of consideration concerning
performance then could not recover anything

Chandler – losses lay where they fell

fibrosa

Whincup

Connected book

Written for

Institution
Study
Course

Document information

Uploaded on
June 18, 2021
Number of pages
2
Written in
2020/2021
Type
Other
Person
Unknown

Subjects

$11.19
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
gxorgiaa
1.0
(1)

Also available in package deal

Get to know the seller

Seller avatar
gxorgiaa Queen Mary, University of London
Follow You need to be logged in order to follow users or courses
Sold
15
Member since
5 year
Number of followers
9
Documents
97
Last sold
4 year ago
a-level and university study resources

perfect and easy to use, A/A* a-level revision detailed and clear law study resources and pieces of work

1.0

1 reviews

5
0
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions