Introduction...........................................................................................................................................2
Step 1: Measure the topsoil excavation.................................................................................................3
Step 2: Measure disposal of excavated topsoil......................................................................................3
Step 3: Measure the trench excavation.................................................................................................4
Step 4: Measure the earthwork support................................................................................................4
Step 5: Measure the compaction of the excavation..............................................................................5
Step 6: Measure the concrete foundations...........................................................................................5
Step 7: Measure brickwork up to DPC level...........................................................................................6
Step 8: Adjustment of filing to trench....................................................................................................6
Step 10: Adjustment of topsoil..............................................................................................................7
Step 11: Measure the damp proof course.............................................................................................8
Step 13: Measure Coping.......................................................................................................................8
Abstract Sheet.......................................................................................................................................9
Measuring,
Estimating
November 5
and
Tendering
Assignment 1
Stephen O’Brien
, Contents
Introduction...........................................................................................................................................2
Step 1: Measure the topsoil excavation.................................................................................................3
Step 2: Measure disposal of excavated topsoil......................................................................................3
Step 3: Measure the trench excavation.................................................................................................4
Step 4: Measure the earthwork support................................................................................................4
Step 5: Measure the compaction of the excavation..............................................................................5
Step 6: Measure the concrete foundations...........................................................................................5
Step 7: Measure brickwork up to DPC level...........................................................................................6
Step 8: Adjustment of filing to trench....................................................................................................6
Step 10: Adjustment of topsoil..............................................................................................................7
Step 11: Measure the damp proof course.............................................................................................8
Step 13: Measure Coping.......................................................................................................................8
Abstract Sheet.......................................................................................................................................9