100% satisfaction guarantee Immediately available after payment Read online or as PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Cranes, Derricks, Hoists, Elevators, Conveyors Questions with Complete Solutions.

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
19-03-2026
Written in
2025/2026

A Certified Person is ________________. - Answer An individual who has passed certain requirements set forth for operating cranes as outlined by an accrediting organization such as NCCCO and CIC. A Competent person is ________________. - Answer An individual who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous or dangerous to employees, and who has authority to take prompt corrective measures to eliminate them. NCCA stands for _____________. - Answer National Commission for Certifying Agencies No crane or hoist shall be placed in service on a Turner project until ________________ and supplemental reports are submitted to Turner indicating that the crane or hoist meets the manufacturer's inspection criteria. - Answer -An annual third party inspection If the manufacturer's inspection criterion does not exist, ______________, familiar with crane or hoist's design and dynamics, may develop or use existing inspection criteria - Answer -A structural engineer Turner requires all contractors using cranes to have a _____________ completed on site after the crane is set up, prior to use and quarterly thereafter. This does NOT include small delivery cranes 5 TONS in capacity or less. Documentation of this inspection must be submitted to Turner. - Answer 3rd-party inspection __________ or ____________ will require the 3rd party inspector to be on the jobsite the entire time of this activity. The inspector will review the PTP, be part of any daily crew meetings, inspect the workers equipment/tools, and the crane parts and pieces as it is being erected/jumped. - Answer -Tower crane erection -Jumping a section of the crane Turner requires all crane operators be experienced on the model of crane to be operated and certified by __________ or _________ for that model. Copies of their certifications must be submitted to Turner. If other licensing is required by state or local agencies to operate a crane, the operator's credentials will be required for review by Turner prior to mobilization. - Answer - the National Commission for Certification of Crane Operators (NCCCO)

Show more Read less
Institution
NCCCO Lift Director Certification
Course
NCCCO Lift Director Certification

Content preview

Cranes, Derricks, Hoists, Elevators,
Conveyors Questions with Complete
Solutions.
A Certified Person is ________________. - Answer An individual who has passed certain
requirements set forth for operating cranes as outlined by an accrediting organization such as
NCCCO and CIC.



A Competent person is ________________. - Answer An individual who is capable of
identifying existing and predictable hazards in the surroundings or working conditions which are
unsanitary, hazardous or dangerous to employees, and who has authority to take prompt
corrective measures to eliminate them.



NCCA stands for _____________. - Answer National Commission for Certifying Agencies



No crane or hoist shall be placed in service on a Turner project until ________________ and
supplemental reports are submitted to Turner indicating that the crane or hoist meets the
manufacturer's inspection criteria. - Answer -An annual third party inspection



If the manufacturer's inspection criterion does not exist, ______________, familiar with crane
or hoist's design and dynamics, may develop or use existing inspection criteria - Answer -A
structural engineer



Turner requires all contractors using cranes to have a _____________ completed on site after
the crane is set up, prior to use and quarterly thereafter. This does NOT include small delivery
cranes 5 TONS in capacity or less. Documentation of this inspection must be submitted to
Turner. - Answer 3rd-party inspection



__________ or ____________ will require the 3rd party inspector to be on the jobsite the
entire time of this activity. The inspector will review the PTP, be part of any daily crew meetings,
inspect the workers equipment/tools, and the crane parts and pieces as it is being
erected/jumped. - Answer -Tower crane erection



-Jumping a section of the crane



Turner requires all crane operators be experienced on the model of crane to be operated and
certified by __________ or _________ for that model. Copies of their certifications must be
submitted to Turner. If other licensing is required by state or local agencies to operate a crane,
the operator's credentials will be required for review by Turner prior to mobilization. - Answer
- the National Commission for Certification of Crane Operators (NCCCO)

, - Crane Institute of America



Any lift exceeding ___ of the cranes rated chart capacity (as configured), or lifts involving ____
or more cranes, or some other operation with exceptional level of risk shall be considered a
critical lift. A critical lift plan must be submitted to Turner supervision for review prior to the lift.
- Answer -75%



-2



A pre-planning meeting to discuss the critical lift will be held in the field with the crew to
discuss, at a minimum, what 5 topics? - Answer -Calculation of gross weight load

-Load chart calculations

-Radius measurements anticipated during the lift

-Weather and soil conditions

-Overhead high voltage power line clearances.



Calculations for the lift are to be reviewed during this meeting.



The swing radius of cranes must be ________ at all times while working on site. - Answer
Properly barricaded



Wire rope, its attachments, fittings, sheaves and safety devices must be inspected
________________. Copies of the inspections must be submitted to Turner. - Answer
According to the manufacturer's recommendations.



Wedge sockets and fittings must be the proper size to match the wire rope and must move to
hold the wire rope _______. The dead end must be terminated according to ANSI B30.5 and
must not be attached, in any manner, to the _________. - Answer -Under load



- Live side of the load line.



An _______ device is required on all lifting lines except those engaged in driving piles. - Answer
Anti two-block



A qualified and certified rigger must inspect the rigging ___(When?)____. Only qualified and
certified riggers may rig on this project. - Answer Prior to each shift



All windows in cabs must be ________ that produces no visible distortion that will interfere
with the safe operation of the machine. - Answer Safety glass

Written for

Institution
NCCCO Lift Director Certification
Course
NCCCO Lift Director Certification

Document information

Uploaded on
March 19, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9 Webster University
View profile
Follow You need to be logged in order to follow users or courses
Sold
835
Member since
2 year
Number of followers
126
Documents
27460
Last sold
1 day ago
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3.6

151 reviews

5
67
4
19
3
25
2
12
1
28

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions