COMPREHENSIVE QUIZZES &
SOLUTIONS
In order to obtain NOI coverage under the IGP, PRDs include: - ANSWERNOI and
electronic certification by the LRP
Permit registration fee
Site Map
SWPPP
If the discharger must redact information in order to comply with federal law that
addresses security in the US, the discharger must also submit - ANSWERA written
justification that the information redaction is necessary to comply with federal law
What are three reasons for a discharger submitting an NOT in SMARTs? - ANSWER-
the facilities' industrial operations have changed and are no longer subject to the IGP
-operation of the facility has been transferred to another entity
-the facility has ceased operations, completed closure activities, and removed all
industrial related pollutants
A person in which position would be eligible to be an LRP: Maintenance supervisor,
QISP consultant, Public works director, or Monitoring consultant? - ANSWERPublic
works director
The temporary suspension of industrial activities requires what to be uploaded in
SMARTS? - ANSWER-The justification for why the monitoring is infeasible at the facility
during the temporary suspension
-The projected date that the industrial activities will resume at the facility
-SWPPP revisions specifically addresses the facility stabilization BMPs
-The date the facility is fully stabilized for temporary suspension of industrial activities
Authorized NSWDs include which of the following: discharges from a broken water main
in an employee parking lot; fire hydrant testing; rinse water from industrial equipment
washing, BMPs are deployed as needed; water from landscape irrigation that runs
through the facility's stockpiled materials? - ANSWERFire Hydrant Testing
Name four things required to be in the SWPPP? - ANSWER-Storm Water Pollution
Prevention Team members
-Potential pollutant sources
-Scheduled facility operating hours
-Minimum BMPs