CM Final Questions With Complete Solutions



In which of the following stage does the contractor have the major responsibility to coordinate

all necessary tasks associated with that stage? - (ANSWER)Close-out



Which member of the contractor's team is responsible for the day-to-day production activities

on the jobsite? - (ANSWER)superintendent



Which member of the project team is responsible for the means and methods of construction? -
(ANSWER)contractor



Who is the person on the contractor's team responsible for directing the workers? - (ANSWER)The
foreman



The____is responsible for design phase of a construction project. - (ANSWER)The architect



The owner of a new skyscraper in Chicago desires the shortest possible construction time. What

delivery method(s) would be a good choice(s)? - (ANSWER)1) Design-Build

2) Agency Construction Management



There is insufficient design information for you to complete an accurate cost estimate for a bid.

What is the most likely thing for you to do? - (ANSWER)Dont Bid



Which document gives specific information about a project and includes the signatures of the

contractor and the owner? - (ANSWER)agreement



An estimate would be used for which of the following? - (ANSWER)1) To make a decision regarding the
size of a project

2) To make a decision regarding the quality of the finishes

3) To evaluate a subcontractor's bid

,CM Final Questions With Complete Solutions



From the owner's perspective, conceptual estimates are helpful because: - (ANSWER)None of the above



A performance bond is for the following purpose: - (ANSWER)To give an owner confidence that the
construction work will be completed



Which of the following would typically be of concern to a general contractor when developing a

detailed estimate? - (ANSWER)1) Local economic conditions

2) Familiarity with similar types of work

3) Identity of the client



A contractor's surety rating is based on the following: - (ANSWER)1) Her/his integrity

2) Her/his financial ability

3) Her/his experience



A successful estimate by a bidding contractor has the following characteristics: - (ANSWER)Costs reflect
local conditions



A bid submittal that fails to include a required bid bond would be unresponsive. - (ANSWER)True



A design-build delivery method typically results in the owner having one contract with the

architect and another contract with the contractor. - (ANSWER)False



The only way a contractor can get accurate costs for a bid estimate are if he has done similar

work and has historical data. - (ANSWER)False



City location factors are used when estimating a job that is located out of town. - (ANSWER)True



Conceptual estimates are generated by general contractors as part of competitive bidding. -
(ANSWER)False

, CM Final Questions With Complete Solutions




Wage rates are the same for all the workers on a job - (ANSWER)False



Preliminary estimates are typically completed by the architect. - (ANSWER)True



The longer a project takes the larger the indirect project costs will be. - (ANSWER)True



What typically happens if a contractor fails to submit his/her bid on time? - (ANSWER)The contractor
doesnt recieve the job and impacts reputation



What are two ways in which the type or complexity of a project can affect a contractor's ability

to qualify for the job? - (ANSWER)Contractor must qualify to buy bonds



You are a contractor interested in bidding for a new office building in town. Which bid document

will provide information to vou on how the bid forms are to be completed and where and when

to submit your bid? - (ANSWER)Design-Bid-Build



Name three design phases of a construction project. - (ANSWER)1) Schematic Design

2) Design Development

3) Final Design



Which type of delivery method is typically least risky for the owner, and is riskiest for the

contractor and why? - (ANSWER)1) Design-bid-build is least risky for the owner because they get a fixed
price of the project

2) Design-bid-build is risky for the general contractor because they are responsible for cost over

run



What are the five categories for LEED AP? - (ANSWER)1) Leed AP Design+ construction

2) Leed AP operations+ Maintenance

Written for

Institution
CM F
Course
CM F

Document information

Uploaded on
March 2, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
SmarterCrest

Get to know the seller

Seller avatar
SmarterCrest Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
1319
Member since
2 months
Number of followers
0
Documents
602
Last sold
4 weeks ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions