QUESTIONS AND ANSWERS | 2026 UPDATE | WITH
COMPLETE SOLUTION
, 2 of 333
Term
A person standing near a ground that is attached to a crane that has
made contact with the power lines is exposed to
Give this one a try later!
The controlling entity Full fault potential
the person assigned prior to the lift Step potential
Don't know?
3 of 333
Term
Rotation resistant wire rope used as a host line on a boom truck
must be replaced when
Give this one a try later!
6 broken wires in a lay length Boom length indicator
post a signalperson to check 2 broken wires in 6 rope
clearances diameters
, Don't know?
4 of 333
Term
Screw pin shackles are sized by the diameter of the
Give this one a try later!
Acids Ends
Bow Side
Don't know?
5 of 333
Term
When the employee in charge is going to release a clearance, they
must
Give this one a try later!
Notify each employee under
2 randomly distributed broken wires
the clearance, make sure each
in 6 wire rope diameters or 4
employee is in the clear, and
randomly distributed broken wires
make sure the grounds are
in 30 rope diameters
removed
, boom damage Next lower angle listed
Don't know?
6 of 333
Term
According to ASME B30.5, when working around power lines of
more than 750kV, how much clearance is generally required from
any part of the crane and its load
Give this one a try later!
Front 10 ft.
45 ft 20 mph
Don't know?
7 of 333
Term
What is required to be on a Hydraulic Crane in order to hoist
personnel?
Give this one a try later!