Questions and Answers (Latest
Update 2026)
Who should initiate submittals? -
correct answer ✅Subcontractor and/or suppliers
Submittal requirments for a project are contained in the
specifications of the contract -
correct answer ✅True
the construction team must submit everything that the
specifications require as a minimum -
correct answer ✅True
Once received back from the architect, all submittals should be? -
correct answer ✅Reviewed for changes
A subcontractor is bidding on unit masonry for a project, which of
the following is not true with regard to the subcontractors
responsibilities when reviewing the technical specifications. -
correct answer ✅The subcontractor is only responsible for the
section he/she bidding and no others.
,CNST 201 Final Dan B Exam
Questions and Answers (Latest
Update 2026)
submittals are one of the final design steps and also one of the first
steps in quality control. -
correct answer ✅true
who is responsible for approving all submittals? -
correct answer ✅Architect
the less documents that are received back from an owner or
architect with approval signature and stamp on them, the better off
the subcontractors are suppliers are. -
correct answer ✅false
the management of submittals also help the general contractor by -
correct answer ✅Checking the validity of the construction
schedule
Which of the following is a submittal -
correct answer ✅All of the above 3
, CNST 201 Final Dan B Exam
Questions and Answers (Latest
Update 2026)
open bid method contracts usually contain these conditions -
correct answer ✅Awarded solely on price, and conduct pre-bid
conferences
Pricing method selections is based on how much___ the owner is
willing to assume -
correct answer ✅risk
In job order contracting contracts are usually awarded on a multi-
year basis with the contracting parties agreeing on a set "price list"
for cost of tasks to be performed -
correct answer ✅True
Negotiated method contracts usually contain these conditions
( select all that apply) -
correct answer ✅Awarded based on criteria selected by the
owner, conduct pre-bid conferences
Which of the following is not an advantage of a Cost-Plus Contract?
-
correct answer ✅Cost in not optimized