Answers (Latest Update 2026)
Which type of estimate is the most accurate? -
correct answer ✅Unit price estimate
What does AWP stand for? -
correct answer ✅Advanced Work Packaging
Which of these is not a reported benefit of AWP by the industry? -
correct answer ✅Lower initial cost.
The portion of the plot plan that has been defined jointly by
Engineering and Construction that represents a logical physical
envelope of work is called: -
correct answer ✅Construction Work Area
The portion of work that contains all the necessary elements for a
single construction crew to complete that portion of the work is
called: -
correct answer ✅Installation Work Package.
The logical subdivision of a CWA construction scope into a defined
geographic area and discipline is called: -
correct answer ✅Construction Work Package.
,CNST 1361 Final Exam Questions and
Answers (Latest Update 2026)
The framework that represents the way a project is defined,
planned and managed by breaking down the scope into
manageable segments is called: -
correct answer ✅Work Breakdown Structure.
The optimal construction sequence to assemble the facility is called
the __________________, and should be defined during the early
planning stages of a project: -
correct answer ✅Path of Construction.
Which is NOT a potential result of AWP? -
correct answer ✅Plant performance.
The Critical Path Method reveals the contiguous path of activities in
a network having the shortest total duration and thus defining the
minimum duration of the project -
correct answer ✅False
What are some ways to accelerate a schedule (check all that
apply)? -
correct answer ✅A -
, CNST 1361 Final Exam Questions and
Answers (Latest Update 2026)
Revise the schedules logic
B-
Use overtime
D-
Use substitute materials or equipment
E-
Increase crew size
What does RFI stand for? -
correct answer ✅Request for information
Cost data provided by national firms (such as R.S.Means) must be
adjusted to the specific project location. -
correct answer ✅True
Quality construction is good, and every designer should specify the
highest-quality project components. -
correct answer ✅False
Which of the following will NOT increase the cost of a project? -
correct answer ✅Increased availability of labor