⩥ AHJ. Answer: Working plans shall be submitted for approval to the
_____ before any equipment is installed or remodeled.
⩥ Pressure-Regulating devices. Answer: ____ shall not be used
⩥ Control Valves. Answer: ______ shall not be installed in the piping
from the fire department connection to the fire service main
⩥ Control Valves. Answer: _____ shall be permitted in the system
downstream of the fire department connection
⩥ Check Valve. Answer: When more than one water supply exists, a
___________ shall be installed in each connection
⩥ Control Valve. Answer: All check valves shall have a ________
installed upstream and downstream of the check valve.
⩥ 40 ft. Answer: A post indicator valve installed not less than____ from
the building
, ⩥ 32-40 inches. Answer: Where post indicator valves are used, they
shall be set so that the top of each post is _______ above final grade
⩥ not be required. Answer: Supervision of underground gate valves with
roadway boxes shall ____________
⩥ not be less than 6 inches. Answer: The connection from the hydrant to
the main shall ___________
⩥ not less than 40 ft. Answer: Hydrants shall be located _________
from the buildings to be protected
⩥ flat stones, concrete slabs, or other approved material. Answer:
Hydrants shall be installed on __________
⩥ less than 18 inches. Answer: The center of a hose outlet shall not be
____________ above final grade
⩥ more than 36 inches. Answer: The center of a hose outlet shall not be
_______ above final grade