100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Power engineering Class 4 Part B Exam Questions With Complete Solutions

Rating
-
Sold
7
Pages
612
Grade
A+
Uploaded on
20-01-2026
Written in
2025/2026

Power engineering Class 4 Part B Exam Questions With Complete Solutions

Institution
Power Engineering Class 4 Part B
Course
Power engineering Class 4 Part B











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Power engineering Class 4 Part B
Course
Power engineering Class 4 Part B

Document information

Uploaded on
January 20, 2026
Number of pages
612
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Power engineering Class 4 Part B Exam Questions With Complete Solutions




b - (ANSWER)A prime mover is

a) an electric motor

b) a steam turbine

c) a centrifugal pump

d) an air compressor

e) a boiler



c - (ANSWER)Large power production plants tend to be of the thermal type because they can burn solid
fuels and:



a) they are the least expensive to build

b) the noise level is much less than internal combustion

engines

c) the heat cycle they use is the most efficient

d) solid fuels are the most plentiful and cheapest

e) require the least amount of manpower



c - (ANSWER)Whenever feasibly possible, when checking bearings on running pieces of equipment it is
wise to



a) check the oil quality leaving each

b) check the oil quantity leaving each

c) get accustomed to normal running temperature and

vibration by feel

d) smell the normal odors of the running bearing

e) observe the temperature on a thermometer



a - (ANSWER)One of the first ways to detect a fault in a reciprocating

,Power engineering Class 4 Part B Exam Questions With Complete Solutions




engine is

a) by sound

b) temperature indication

c) performance efficiency

d) by oil consumption

e) by smell



d - (ANSWER)A steam turbine's exhaust can often supply a process with

steam because

a) processes always require a lower steam pressure

b) processes never require the high steam temperatures

turbines do

c) turbine exhaust steam is always dry and saturated

d) it is free of oil

e) the steam will be at a temperature above the initial

temperature



c - (ANSWER)The exhaust steam from a steam turbine is more acceptable for process than the exhaust
from a steam engine because

a) it is much hotter

b) it is easily controlled

c) it is free of oil

d) it is free of moisture

e) it contains more condensate



d - (ANSWER)Turbines often have segmental carbon ring sealing glands

which are held in place by

a) labyrinths

,Power engineering Class 4 Part B Exam Questions With Complete Solutions




b) shrouding

c) drive screws

d) garter springs

e) thrust runners



d - (ANSWER)A steam turbine should trip or shut down when normal

operating speed is exceeded by

a) 250 RPM

b) 3 to 5%

c) 50 RPM

d) 10 to 15%

e) 25 RPM



b - (ANSWER)Condensing turbines



a) are always impulse turbines

b) will have a vacuum in the last row of rotating blades

c) will use the condensate for heating

d) are very small units

e) cannot have counter-flow stages



b - (ANSWER)Which turbine uses a condenser?



a) back pressure turbine

b) a turbine exhausting to a vacuum

c) a bleeder turbine exhausting at atmospheric pressure

d) a non-condensing extraction turbine

, Power engineering Class 4 Part B Exam Questions With Complete Solutions




e) a turbine exhausting to atmosphere



e - (ANSWER)The shrouding installed on the blading of a steam turbine serves to:



a) cool the blade tips

b) expand the steam

c) stop the steam flow

d) heat the steam

e) confine the steam to the blades



a - (ANSWER)The turbine over speed trip:



1. prevents the turbine from vibrating

2. prevents the turbine exceeding the maximum rated speed

3. is operated by a spring loaded pin in the rotating blades

4. will close the steam stop valve

5. should be tested before the turbine is placed in service



a) 2, 4, 5

b) 2, 3, 4, 5

c) 1, 2, 4

d) 3, 4, 5

e) 4, 5



b - (ANSWER)The over speed trip of a steam turbine



a) operates on turbine vibrations due to high speed
Free
Get access to the full document:
Download

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
NursAid
5.0
(2)

Get to know the seller

Seller avatar
NursAid Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
245
Member since
7 months
Number of followers
1
Documents
302
Last sold
3 hours ago

I OFFER QUALITY A+ GRADED DOCS....WELCOME ALL

5.0

2 reviews

5
2
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions