100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Florida (36-FL-BM) Building Project Management Practice Exam (100 Questions) AND CORRECT ANSWERS GRADE A

Rating
-
Sold
-
Pages
36
Grade
A+
Uploaded on
18-01-2026
Written in
2025/2026

Florida (36-FL-BM) Building Project Management Practice Exam (100 Questions) AND CORRECT ANSWERS GRADE A

Institution
Engineering Technology
Course
Engineering technology











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Engineering technology
Course
Engineering technology

Document information

Uploaded on
January 18, 2026
Number of pages
36
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Florida (36-FL-BM) Building Project Management Practice Exam (100 Questions) AND
CORRECT ANSWERS GRADE A



1. According to Florida Building Code, what is the minimum design wind speed for Risk
Category II buildings in Miami-Dade County?

A) 120 mph

B) 140 mph

C) 160 mph

D) 180 mph

**ANSWER: C**

**EXPLANATION:** Florida Building Code, Chapter 16 requires a minimum design wind
speed of 160 mph for Risk Category II buildings in High-Velocity Hurricane Zone (HVHZ)
areas including Miami-Dade County.



2. Under Florida law, who is responsible for obtaining the building permit?

A) Property owner

B) Building contractor

C) Design professional

D) All of the above may apply

**ANSWER: D**

**EXPLANATION:** Florida Statutes 553.79 states that the property owner, contractor, or
authorized agent may apply for a building permit.



3. What is the maximum allowable time frame for a building official to issue a permit after
receiving a complete application in Florida?

A) 15 business days

B) 30 business days

C) 45 business days

,D) 60 business days

**ANSWER: B**

**EXPLANATION:** Florida Statutes 553.79 requires building departments to issue permits
within 30 business days of receiving a complete application.



4. According to Florida Accessibility Code, what is the minimum required width for an
accessible parking space?

A) 8 feet

B) 9 feet

C) 11 feet

D) 12 feet

**ANSWER: C**

**EXPLANATION:** Florida Accessibility Code Section 502.2 requires accessible parking
spaces to be at least 11 feet wide, with 5-foot access aisle.



5. What is the minimum required flood elevation for new construction in Coastal A Zone in
Florida?

A) Base Flood Elevation (BFE)

B) BFE + 1 foot

C) BFE + 2 feet

D) BFE + 3 feet

**ANSWER: B**

**EXPLANATION:** Florida Building Code, Chapter 16 requires new construction in
Coastal A Zones to be elevated at least 1 foot above Base Flood Elevation.



6. Under Florida law, when must a Notice of Commencement be recorded?

A) Before applying for permit

,B) Within 30 days after permit issuance

C) Before beginning construction

D) Within 60 days after project completion

**ANSWER: C**

**EXPLANATION:** Florida Statutes 713.135 requires a Notice of Commencement to be
recorded before beginning construction when the project value exceeds $2,500.



7. What is the maximum allowable time frame for completing a building project after permit
issuance in Florida?

A) 6 months

B) 12 months

C) 18 months

D) 24 months

**ANSWER: D**

**EXPLANATION:** Florida Building Code, Chapter 1 allows building permits to remain
valid for 24 months from issuance date, provided work commences within 6 months.



8. According to Florida Energy Code, what is the minimum required R-value for roof
insulation in Climate Zone 2?

A) R-15

B) R-20

C) R-25

D) R-30

**ANSWER: D**

**EXPLANATION:** Florida Energy Conservation Code Table C402.1.3 requires minimum
R-30 for roof insulation in Climate Zone 2.

, 9. What is the minimum required seismic design category for most buildings in Florida?

A) A

B) B

C) C

D) D

**ANSWER: A**

**EXPLANATION:** ASCE 7-16 maps show most of Florida as Seismic Design Category A,
requiring minimal seismic design.



10. Under Florida law, what is the threshold for requiring a licensed architect or engineer to
design a building?

A) 1,000 square feet

B) 2,500 square feet

C) 5,000 square feet

D) 10,000 square feet

**ANSWER: B**

**EXPLANATION:** Florida Statutes 481.229 requires architectural design for buildings
over 2,500 square feet, with certain exceptions.



11. What is the minimum required fire separation distance for unprotected openings in
Type III construction in Florida?

A) 5 feet

B) 10 feet

C) 20 feet

D) 30 feet

**ANSWER: C**

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUANKADA Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
315
Member since
4 year
Number of followers
249
Documents
3878
Last sold
1 week ago
Professionalacademictutor

On this page, you find all documents, package deals, and flashcards offered by seller

3.8

43 reviews

5
25
4
4
3
2
2
6
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions