ALABAMA (AL) SEWER PROJECTS CONTRACTOR PRACTICE EXAM LATEST QUESTIONS ABD CORRECT ANSWERS GRADE A

Institution
Sewage Treatment Worker
Course
Sewage treatment worker











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Sewage treatment worker
Course
Sewage treatment worker

Document information

Uploaded on
January 18, 2026
Number of pages
32
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ALABAMA (AL) SEWER PROJECTS CONTRACTOR PRACTICE EXAM LATEST QUESTIONS
ABD CORRECT ANSWERS GRADE A

Total Questions: 100

Question Types: Multiple Choice

Format: Question + Answer Key + Explanation

References: ADEM Administrative Code, Alabama State Plumbing Code (2015 IPC with
Alabama Amendments), 10 State Standards, ADPH regulations



Q1. According to Alabama law, who must be licensed as a sewer projects contractor?

A) Anyone installing septic systems

B) Contractors performing sewer work over $10,000

C) Anyone installing or repairing sewer lines

D) Only contractors working on municipal projects

Answer: C

Explanation: Alabama requires licensure for any contractor installing, repairing, or
maintaining sewer systems.



Q2. The Alabama Department of Environmental Management (ADEM) regulates sewer
projects primarily under:

A) ADEM Administrative Code Division 335-6

B) Alabama Building Code

C) EPA Clean Water Act

D) All of the above

Answer: A

Explanation: ADEM Division 335-6 specifically covers wastewater systems and sewer
projects.

,Q3. What is the minimum required separation distance between a septic tank and a water
well in Alabama?

A) 50 feet

B) 75 feet

C) 100 feet

D) 150 feet

Answer: C

Explanation: ADEM Admin. Code 335-6-6 requires 100-foot minimum separation between
septic tanks and water wells.



Q4. According to Alabama regulations, what is required before beginning any sewer
construction project?

A) ADEM permit

B) County health department approval

C) Soil evaluation

D) All of the above

Answer: D

Explanation: Most sewer projects in Alabama require ADEM permits, local approvals, and
soil evaluations.



Q5. The minimum required slope for an 8-inch sewer main is:

A) 0.10% (0.0010 ft/ft)

B) 0.40% (0.0040 ft/ft)

C) 0.60% (0.0060 ft/ft)

D) 1.00% (0.0100 ft/ft)

Answer: B

,Explanation: 10 State Standards and Alabama Plumbing Code typically require 0.40%
minimum slope for 8-inch pipes.



Q6. What type of permit is required for sewer projects discharging to waters of the state?

A) NPDES Permit

B) Land Disturbance Permit

C) Building Permit

D) All of the above

Answer: A

Explanation: ADEM issues NPDES permits for discharges to state waters under Clean
Water Act authority.



Q7. The minimum required cover over sewer pipes in roadway areas is:

A) 12 inches

B) 24 inches

C) 36 inches

D) 48 inches

Answer: C

Explanation: Alabama standards typically require 36-inch minimum cover under roadways
for sewer pipes.



Q8. According to Alabama regulations, what is the maximum allowable infiltration rate for
new sewer lines?

A) 100 gallons/inch-diameter/mile/day

B) 200 gallons/inch-diameter/mile/day

C) 500 gallons/inch-diameter/mile/day

D) No limit specified

, Answer: A

Explanation: ADEM standards typically limit infiltration to 100 gallons/inch-
diameter/mile/day.



Q9. What is the minimum required size for a residential sewer service line?

A) 3 inches

B) 4 inches

C) 6 inches

D) 8 inches

Answer: B

Explanation: Alabama Plumbing Code typically requires 4-inch minimum for residential
sewer service.



Q10. The Alabama Onsite Wastewater Board certifies:

A) Sewer contractors

B) Soil classifiers

C) System installers

D) All of the above

Answer: D

Explanation: The Alabama Onsite Wastewater Board certifies all these professionals.



Q11. According to ADEM regulations, what is required for sewer projects in floodplains?

A) Floodproofing measures

B) Elevated structures

C) Both A and B

D) No special requirements

Answer: C
$60.69
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
6lairbowwow33

Get to know the seller

Seller avatar
6lairbowwow33 Notes
View profile
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
4 days
Number of followers
0
Documents
8
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions