100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Alabama Water Distribution Operator Level I – Exam Questions and Correct Answers (Verified)

Rating
-
Sold
-
Pages
28
Grade
A+
Uploaded on
16-01-2026
Written in
2025/2026

Complete set of Alabama Water Distribution Operator Level I exam questions with verified correct answers. Designed to help water system operators review key concepts, reinforce knowledge, and prepare effectively for the certification exam.

Show more Read less
Institution
Alabama Water Distribution
Course
Alabama Water Distribution










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Alabama Water Distribution
Course
Alabama Water Distribution

Document information

Uploaded on
January 16, 2026
Number of pages
28
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • verified exam answers

Content preview

. Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for Page
effective
guides1 included
ofassessment
28 qualifying
for effective
preparation.Alabama
examination
assessment
Questions
preparation.
Water
andDistribution
Answers +Operator
Rationales
Level I Exa




Alabama Water Distribution Operator Level I
Exam Questions And Correct Answers (Verified
Answers) Plus Rationales 2026 Q&A | Instant
Download Pdf

1. What is the primary purpose of a water distribution system?
A. Provide sewage disposal
B. Supply safe and reliable drinking water
C. Monitor groundwater levels
D. Store stormwater
Answer: B
The system’s main goal is to deliver potable water safely and
consistently.
2. Which component maintains system pressure?
A. Hydrants
B. Backflow preventers
C. Pumps
D. Service saddles
Answer: C
Pumps move water and keep pressure at required levels.
3. The standard minimum pressure in a distribution system under
normal conditions is:
A. 10 psi
B. 20 psi
C. 35 psi



Page 1 of 28 . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for effective
guides included
assessment
for effective
preparation.
assessment preparation.

,. Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for Page
effective
guides2 included
ofassessment
28 qualifying
for effective
preparation.Alabama
examination
assessment
Questions
preparation.
Water
andDistribution
Answers +Operator
Rationales
Level I Exa




D. 50 psi
Answer: B
20 psi is widely adopted as the minimum for safe operation.
4. What is the most common type of pipe used today for water
mains?
A. Lead
B. PVC
C. Clay
D. Asphalt-lined
Answer: B
PVC is lightweight, affordable, and corrosion-resistant.
5. The purpose of a blow-off valve is to:
A. Add chemicals
B. Flush out sediment
C. Measure flow
D. Relieve air
Answer: B
Blow-offs allow flushing low-flow areas to remove deposits.
6. Water hammer is caused by:
A. Cold temperatures
B. Sudden valve closure
C. Algae growth
D. High chlorine
Answer: B
Quick valve closure creates a pressure surge known as water
hammer.




Page 2 of 28 . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for effective
guides included
assessment
for effective
preparation.
assessment preparation.

, . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for Page
effective
guides3 included
ofassessment
28 qualifying
for effective
preparation.Alabama
examination
assessment
Questions
preparation.
Water
andDistribution
Answers +Operator
Rationales
Level I Exa




7. Disinfectant residual in a distribution system is maintained to:
A. Reduce turbidity
B. Prevent pipe corrosion
C. Ensure microbial safety
D. Remove hardness
Answer: C
Residual chlorine protects water from microbial contamination.
8. A cross-connection is a link between:
A. Two meters
B. Potable and non-potable systems
C. Pump stations and reservoirs
D. Storage tanks
Answer: B
Cross-connections create contamination risks.
9. Gate valves are primarily used to:
A. Regulate flow
B. Throttle flow
C. Provide isolation
D. Increase pressure
Answer: C
Gate valves isolate sections of pipe; not ideal for throttling.
10. A corporation stop is installed on a:
A. Hydrant
B. Main
C. Service line
D. Well casing




Page 3 of 28 . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for effective
guides included
assessment
for effective
preparation.
assessment preparation.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EDUTHRIFT Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
4305
Member since
1 year
Number of followers
30
Documents
2606
Last sold
1 month ago

4.7

942 reviews

5
798
4
79
3
34
2
17
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions