2026/2027
Gmail:
LGAV 3110 Final Exam Questions
and Answers| Verified
The _________ department evaluates maintenance requirements and
establishes the maintenance program for the airline.
Mechanics
Maintenance
Engineering
PP&C Ans: Engineering
An EO can be initiated due to
A reliability program alert
Work force requirement
AD, SB, or SL
All of the above Ans: All of the above
________study the practical aspects of aviation systems and
equipment while ________are trained in the basics of science and are
'problem solvers'
Designers, Avionics specialists
Technicians, Troubleshooters
Mechanics, Engineers
Maintenance Engineers, Managers Ans: Mechanics, Engineers
One of the primary functions of Engineering is
Aircraft repair
New equipment evaluation
, 2026/2027
Gmail:
Forecasting future problems
Resource management Ans: New equipment evaluation
Engineering is considered a substitute for maintenance when
mechanics are unable to solve a problem.
True
False Ans: False
PP&C controls maintenance by
Adjusting the plan and keeping checks on schedule
Creating long and short-term maintenance models for mechanics to
follow
Planning routing, variable routine, and non-routine tasks
Writing technical publications for future planning Ans: Adjusting the
plan and keeping checks on schedule
Planning and scheduling the appropriate manpower, parts and
facilities are examples of PP&C's _____ function.
Forecasting
Production
Planning
Controlling Ans: Planning
PP&C is primarily responsible for
Scheduling daily, 48-hour, and transit checks
Ordering parts and estimating the amount of labor needed for
unscheduled maintenance
Planning and scheduling all aircraft maintenance activity within an
airline
, 2026/2027
Gmail:
Providing feedback on completed maintenance jobs Ans: Planning and
scheduling all aircraft maintenance activity within an airline
Schedules for checks and known modifications are finalized in which
type of forecast?
Long-term
Intermediate term
Short-Term
Extended-term Ans: Short-Term
This PP&C function is considered an 'idealized' responsibility
Forecasting
Production
Planning
Controlling Ans: Planning
Preliminary planning consists of
Implementing maintenance actions
Developing the maintenance program by engineering
Providing feedback from mechanics to PP&C for more accurate future
planning
Coordinating with flight operations and group handling Ans:
Developing the maintenance program by engineering
What are the three primary functions of PP&C?
Production, Planning, & Control
Forecasting, Planning, & Control
Maintenance, Planning, & Control
Gmail:
LGAV 3110 Final Exam Questions
and Answers| Verified
The _________ department evaluates maintenance requirements and
establishes the maintenance program for the airline.
Mechanics
Maintenance
Engineering
PP&C Ans: Engineering
An EO can be initiated due to
A reliability program alert
Work force requirement
AD, SB, or SL
All of the above Ans: All of the above
________study the practical aspects of aviation systems and
equipment while ________are trained in the basics of science and are
'problem solvers'
Designers, Avionics specialists
Technicians, Troubleshooters
Mechanics, Engineers
Maintenance Engineers, Managers Ans: Mechanics, Engineers
One of the primary functions of Engineering is
Aircraft repair
New equipment evaluation
, 2026/2027
Gmail:
Forecasting future problems
Resource management Ans: New equipment evaluation
Engineering is considered a substitute for maintenance when
mechanics are unable to solve a problem.
True
False Ans: False
PP&C controls maintenance by
Adjusting the plan and keeping checks on schedule
Creating long and short-term maintenance models for mechanics to
follow
Planning routing, variable routine, and non-routine tasks
Writing technical publications for future planning Ans: Adjusting the
plan and keeping checks on schedule
Planning and scheduling the appropriate manpower, parts and
facilities are examples of PP&C's _____ function.
Forecasting
Production
Planning
Controlling Ans: Planning
PP&C is primarily responsible for
Scheduling daily, 48-hour, and transit checks
Ordering parts and estimating the amount of labor needed for
unscheduled maintenance
Planning and scheduling all aircraft maintenance activity within an
airline
, 2026/2027
Gmail:
Providing feedback on completed maintenance jobs Ans: Planning and
scheduling all aircraft maintenance activity within an airline
Schedules for checks and known modifications are finalized in which
type of forecast?
Long-term
Intermediate term
Short-Term
Extended-term Ans: Short-Term
This PP&C function is considered an 'idealized' responsibility
Forecasting
Production
Planning
Controlling Ans: Planning
Preliminary planning consists of
Implementing maintenance actions
Developing the maintenance program by engineering
Providing feedback from mechanics to PP&C for more accurate future
planning
Coordinating with flight operations and group handling Ans:
Developing the maintenance program by engineering
What are the three primary functions of PP&C?
Production, Planning, & Control
Forecasting, Planning, & Control
Maintenance, Planning, & Control