A CM's role and responsibilities are governed solely by the Owner/CM Agreement.
True False - CORRECT ANSWER True
QUESTION : There are two basic forms of CM, agency and at-risk. Each form provides for the
basic services of construction management practice. However, there are some key
differences. Which of the following do not apply to both CM forms?
A) Both forms provide advice to the owner on constructibility, budget and the schedule.
B) Both require that the liabilities and risks assumed by the parties be clearly understood,
coordinated, and stated in the respective contracts.
C) Both forms allow the CM to function in an advisory role for the entire engagement of the
CM.
D) Services can vary based on the contractual relationships of the parties and the risks that
are assumed. - CORRECT ANSWER C) Both forms allow the CM to function in an
advisory role for the entire engagement of the CM.
QUESTION : Construction management had its beginnings in the early to mid-1960's. Which
of the following factors contributed to the initial use of this delivery system?
A) The need to reduce the overall time and cost associated with project delivery.
B) The increasing cost of money and the unpredictability of project funding streams.
C) The changing role of the general contractor and the increasing numbers of specialty trade
contractors.
D) All of the above. - CORRECT ANSWER D) All of the above.
2026 2027 GRADED A+
,2|Page
QUESTION : The General Services Administration was the first federal agency to use
construction management. - CORRECT ANSWER True
QUESTION : The General Services Administration, the Department of Health, Education and
Welfare (now HHS), and the Veterans Administration ran into similar difficulties in the use of
construction management. Which of the following was/were common problems for all three
agencies?
A) Funding restrictions
B) Claims
C) Change conditions
D) All of the above - CORRECT ANSWER D) All of the above
QUESTION : CMAA was formed and incorporated 1982 with its primary focus being the
growth and development of the construction management profession. - CORRECT
ANSWER True
QUESTION : The CMAA Construction Management Standards of Practice is intended as a
guide to the range of services that constitute professional construction management. They
seek to meet the documented need for definitions of what construction management services
are, without unduly structuring the methodologies by which those services are provided by
the CM. - CORRECT ANSWER True
QUESTION : The goals of the Construction Management Association of America (CMAA)
include:
A) Setting standards and developing contract documents for construction management
practice.
B) Expanding the understanding of the construction management concept and its use in the
marketplace.
C) Advocacy for construction management in the legislative, regulatory, and judicial arenas of
federal, state, and local governments.
D) All of the above. - CORRECT ANSWER D) All of the above
2026 2027 GRADED A+
,3|Page
QUESTION : The fact that an individual is certified or licensed in any other profession does
not, per se, establish him/her as a qualified CM.
True False - CORRECT ANSWER True
QUESTION : Certification as a CM means the construction management practitioner has
"state of the art" knowledge and capability to practice construction management.
True False - CORRECT ANSWER False
QUESTION : Recruiting and training are business matters and normally do not involve ethical
concerns.
True False - CORRECT ANSWER False
QUESTION : Construction management is a concept that is susceptible to overselling.
True False - CORRECT ANSWER True
QUESTION : Failure to provide quality services is a business and not an ethical question.
True False - CORRECT ANSWER False
QUESTION : Contracting for adequate fees is both a business and an ethical issue.
True False - CORRECT ANSWER True
QUESTION : The ethics of the CM profession focus primarily on a CM's relationships in dealing
with its clients.
True False - CORRECT ANSWER True
QUESTION : The possible approaches for delivering a project are virtually unlimited. A key
reason for such variations is:
2026 2027 GRADED A+
, 4|Page
A) The different roles that can be assumed by project participants.
B) Different forms of contracts and methods of compensation that can be used.
C) The different levels of care, responsibility, and risks assumed by the parties involved.
D) All of the above. - CORRECT ANSWER D) All of the above
QUESTION : The traditional delivery system is characterized by executing the major phases of
a project in:
A) An overlapping concept
B) A linear sequence
C) A fast track method
D) All of the above - CORRECT ANSWER B) A linear sequence
QUESTION : A key advantage of the traditional delivery approach is:
A) With the traditional delivery system, the cost of the construction phase is known before
construction starts.
B) Facility features are fully determined & specified.
C) When the construction contract is signed, the major risk belongs to the contractor.
D) All of the above - CORRECT ANSWER B) Facility features are fully determined &
specified.
QUESTION : Design-build and at-risk construction management delivery systems allow the
option to fast-track or phase a project.
True False - CORRECT ANSWER True
QUESTION : Most definitions of construction management are similar. However, a contractual
definition is not known until:
A) The legal form of the CM contract is chosen.
B) The specific scope of services to be provided is identified.