100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
12-01-2026
Written in
2025/2026

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS

Institution
NICET
Course
NICET









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NICET
Course
NICET

Document information

Uploaded on
January 12, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NICET LEVEL 1 HIGHWAY
CONSTRUCTION EXAM QUESTIONS
AND ANSWERS9

Acceptance - ANSWERS-The written acceptance by the Department of the Work.



acceptance testing - ANSWERS-Testing conducted by the Department to measure the degree of
compliance to the Contract



actual cost - ANSWERS-The computed cost using calculations provided



addendum - ANSWERS-A Contract revision or response to a Contractor inquiry issued after
advertisement and before the opening of bids.



as-built quantity - ANSWERS-The quantity of a completed Item eligible for payment



authorized funding amount - ANSWERS-The amount of funds authorized by the Department for
the Contract



Bidder - ANSWERS-The individual, firm, partnership, corporation, joint venture, or any
acceptable combination thereof that submits a bid to the Department.



bridge - ANSWERS-. A structure, other than a culvert, including supports, erected over a
depression or an obstruction, such as water, highway, or railway, and having a track or
passageway for carrying traffic or other moving loads and having a length 3 measured along the
center of the structure of more than 20 feet between undercopings of abutments or extreme
ends of openings for multiple boxes. Structure dimensions are defined as follows:

, bridge length - ANSWERS-The overall length measured along the line of survey stationing from
back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor;
but, in no case less than the total clear opening of the structure



bridge width - ANSWERS-The clear width measured at right angles to the longitudinal centerline
of the bridge between the bottom of curbs, or in the case of multiple height of curbs, between
the bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or
railing



Change Order. - ANSWERS-A written order issued by the Department to the Contractor after
execution of the Contract authorizing one or more of the following: 1. Changes in the Work. 2.
Modifications in the basis of payment. 3. Modifications to Contract Time.



Commercially Useful Function - ANSWERS-Occurrences in which the subcontractor is
responsible for the execution of a distinct element of the work of a contract and carrying out its
responsibilities by actually performing, managing, and supervising the work involved, and with
respect to materials and supplies used on the contract, prepares the estimate, negotiates price,
determines quality and quantity, orders the material, arranges delivery, installs (where
applicable), and pays for the material and supplies itself for the project.



Completion - ANSWERS-When all of the following have occurred: 1. The Work has been
satisfactorily completed in all respects according to the Contract. 2. The Project is ready for use
by the Department as required by the Contract. 3. The Contractor has satisfactorily executed
and delivered to the RE all documents, certificates, and proofs of compliance required by the
Contract including the Notice of Completion.



construction operations - ANSWERS-Physical work done in the performance of the Contract
within the Project Limits. Does not include off-site mobilization, procurement and off-site
storage of materials and plants, engineering, performance bond and payment bond, surveys,
working drawings, off-site field offices, schedules, certificates, forms, or documents

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Bensuda Oxford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
846
Member since
3 year
Number of followers
445
Documents
21415
Last sold
1 day ago
ECONOMICS,NURSING,BIOLOGY AND ALL REVISION MATERIALS

DEDICATED TO PROVIDE YOU WITH THE BEST LEARNING MATERIALS THAT WILL IMPROVE YOUR GRADES ,WELCOME TO ALIZGRADES AND LETS DO IT TOGETHER!!! GOODLUCK!!!!!!!

3.7

158 reviews

5
74
4
24
3
25
2
11
1
24

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions