100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CSLB CLASS B GENERAL CONTRACTOR-S LICENSE - BUILDING-S EXAM- FRAMING & STRUCTURAL

Rating
-
Sold
-
Pages
25
Grade
A+
Uploaded on
12-01-2026
Written in
2025/2026

CSLB CLASS B GENERAL CONTRACTOR-S LICENSE - BUILDING-S EXAM- FRAMING & STRUCTURAL

Institution
CSLB LAW
Course
CSLB LAW










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CSLB LAW
Course
CSLB LAW

Document information

Uploaded on
January 12, 2026
Number of pages
25
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CSLBCLASS B GENERALCONTRACTOR'S LICENSE - v v v v v v




BUILDING'S EXAM: FRAMING & STRUCTURAL
v v v v v




QUESTIONS AND ANSWERS 100% PASS
v v v v v




6 inches - correct answer-How much clearance is needed between the ground and wood siding?
v v v v v v v v v v v v v v




4X10d nails - correct answer-When nailing a continuous header to the studs, best practice is to use:
v v v v v v v v v v v v v v v v




Moisture content, Grade, Species - correct answer- v v v v v v




Graded lumber is stamped with information about the lumber. What is included?
v v v v v v v v v v v




In load bearing walls with holes exceeding 40% of the stud depth. - correct answer- When
v v v v v v v v v v v v v v v




are studs doubled?
v v v




5/8 inch - correct answer-
v v v v




A solid plywood roof deck at 3/12 pitch or greater, receiving asphalt shingles and having rafters laid o ut
v v v v v v v v v v v v v v v v v v




24 inches on center, should have a minimum plywood sheathing thickness of
v v v .v v v v v v v v v v




OSB with edge nailing 4" o.c. and field 6 "o.c. - correct answer-
v v v v v v v v v v v v




Specific information about shear walls, such a type of sheathing and nailing, can usually be found on t he
v v v v v v v v v v v v v v v v v v




building plans. Abbreviations such as "6W4" are common, which would mean:
v v v v v v v v v v v




S-GRN: "Surfaced Green" Not dried, moisture content over 19%.S-
v v v v v v v v




DRY: "Surfaced Dry" Air dried to a moisture content less than 19%. KD: "Kiln Dry" Dried in a heated kiln to
v v v v v v v v v v v v v v v v v v v v




a moisture content less than 19%.MC 15: "Moisture Content 15%" Dried to a moisture content of 15%
v v v v v v v v v v v v v v v v v




or less.HT: "Heat Treated" Heated to at least 133° Fahrenheit for 30 minutes at the board's cor e to kill
v v v v v v v v v v v v v v v v v v v v




any insects present in the wood. - correct answer-
v v v v v v v v v




Graded lumber is marked with an indication of moisture content; which is the driest designation?
v v v v v v v v v v v v v v




To shed water away from the structure at roof to wall transitions
v v v v v v v v v v v




(Step flashing are interwoven between each course of shingles and protect the transition from water int rusion
v v v v v v v v v v v v v v v v




by creating a water shed aka shingle effect.
v v v v v v v v




Next Question v

,Leave Feedback) - correct answer-What is the purpose of a step flashing?
v v v v v v v v v v v




A) Will always be parallel - correct answer-Bracing lines:
v v v v v v v




A) Will always be parallel v v v




B) Should intersect at 90˚ v v v




C) Always run in the same direction v v v v v




D) Can be added at any time
v v v v v




D) Weave shingles under the lower end of the base flashing and over the upper portion of the base flas hing
v v v v v v v v v v v v v v v v v v v v




(In re- v




roof overlays, many roofers will conceal the base flashing under the shingles and apply mastic at the tr
v v v v v v v v v v v v v v v v v




ansition. While this method is allowable for overlays, it is not recommended due to the inherent likelih ood of
v v v v v v v v v v v v v v v v v v v




moisture influence under the shingles at these locations.) - correct answer-
v v v v v v v v v v v




Proper installation of roof pipe and vent penetration base flashing should consist of:
v v v v v v v v v v v v




A) Apply shingles so as to completely conceal base flashing
v v v v v v v v




B) Apply shingles under the base flashing and seal perimeter of base flashing with roof cement
v v v v v v v v v v v v v v




C) Seal pipe/vent penetration with roof cement
v v v v v




D) Weave shingles under the lower end of the base flashing and over the upper portion of the base flas hing
v v v v v v v v v v v v v v v v v v v




A) Structural light framing No: 1 - correct answer- v v v v v v v




Grade designations indicate the recommended use of lumber. Which grade would you chose for buildin g
v v v v v v v v v v v v v v v




trusses?
v




A) Structural light framing No: 1 v v v v




B) Structural light framing No: 3 v v v v




C) Light framing: Construction v v




D) Light framing: Standard v v

, 18" - correct answer-In crawlspace, if the floor is built out of non- pressure
v v v v v v v v v v v v v




treated wood, how high is the floor joist from the soil?
v v v v v v v v v v v




A) Blocking is required at the beginning of any overhang - correct answer-
v v v v v v v v v v v




When building a deck, it may be necessary to use blocking between joists.
v v v v v v v v v v v v v




A) Blocking is required at the beginning of any overhang v v v v v v v v




B) Blocking is required every 10 feet v v v v v




C) Blocking is required if joists are 24" o.c. or more v v v v v v v v v




D) Blocking is required if joists are 8"x or larger v v v v v v v v




24" o. c. - correct answer-What is the maximum spacing of 2 x 4 inch studs on a 1 story house?
v v v v v v v v v v v v v v v v v v v v




B) Not be notched - correct answer-Engineered floor trusses and I-Joists should:
v v v v v v v v v v




A) Always be kept in low humidity v v v v v




B) Not be notched v v




C) Purchased in batches v v




D) Always be approved by an engineer v v v v v




D) 16d 16" o.c.
v v v




(According to the California Residential Code, 16d common nails at 16" o.c. face nail or 10d box nails at
v v v v v v v v v v v v v v v v v v




12" o.c. face nail.) - correct answer-Double top plates are best nailed together with:
v v v v v v v v v v v v v v




A) 10d 24" o.c v v




B) 16d 24" o.c v v




C) 10d 16" o.c v v




D) 16d 16" o.c. v v
$13.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
NurseStudyGuides

Get to know the seller

Seller avatar
NurseStudyGuides Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
6 months
Number of followers
0
Documents
533
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions