RTPM LATEST 2026 STUDY GUIDE QUESTIONS AND ANSWERS GRADED A+

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
09-01-2026
Written in
2025/2026

RTPM LATEST 2026 STUDY GUIDE QUESTIONS AND ANSWERS GRADED A+

Institution
Rtpm
Course
Rtpm









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Rtpm
Course
Rtpm

Document information

Uploaded on
January 9, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

RTPM LATEST 2026 STUDY GUIDE QUESTIONS AND
ANSWERS GRADED A+
✔✔150. What must provide the means of determining that the work is being performed
properly? - ✔✔the SOW

✔✔151. True or False: The SoW should specify the number of copies of reports and the
person to whom they will be delivered. - ✔✔true

✔✔152. True or False: The SoW should specify any physical arrangements necessary
to assure the owner's capability to examine end products. - ✔✔true

✔✔153. When can safety be excluded from the scope? - ✔✔When the project only has
the PM issuing the design documentation only

✔✔154. When will safety be an area of greatest risk to the project? - ✔✔Construction

✔✔155. The purpose of ___________________ is to determine potential risk events
and their characteristics that, should they occur, may have an impact on the project. -
✔✔risk management

✔✔156. What are events or circumstances that affect the original plan or scope of the
project? - ✔✔risk

✔✔157. What are events or circumstances that adversely affect the success of the
project? - ✔✔liability

✔✔158. When do risks become liabilities? - ✔✔when they are not effectively managed

✔✔159. What are the two primary risk components - ✔✔probability of occurrence of that
event & impact of that event occurring

✔✔160. What is the process of identifying and classifying risks for the purposes of
developing strategies and controls to effectively prevent or mitigate risks? - ✔✔risk
assessment

✔✔161. How can PMs begin the risk management plan process? - ✔✔Identification,
analysis, mitigation

✔✔162. What are events or performance characteristics that warn of the occurrence of
risk events? - ✔✔risk triggers

✔✔163. List two ways to identify risk? - ✔✔qualitative and quantitative

, ✔✔164. What determines the potential of each identified risk to become a liability to the
project and identifies any dependencies that exist between risks? - ✔✔risk analysis

✔✔165. What type of risk analysis qualifies the expected impact of cost, timeframe, and
quality of a risk? - ✔✔qualitative risk

✔✔166. What type of risk analysis involves measuring the probability and impact of
each risk? - ✔✔quantitative risk

✔✔167. Impact can be assessed in terms of its effect on which four areas? - ✔✔Time,
cost, quality, risk proximity

✔✔168. What involves identifying the strategy for minimizing the effects of the risk to a
level where the risk can be controlled and managed to ensure that the project objectives
are achieved? - ✔✔risk mitigation

✔✔169. List 5 risk mitigation strategies. - ✔✔avoidance, transference, sharing,
moderation, acceptance

✔✔170. What is one way to avoid risk? - ✔✔Add an assumption or exclusion in the
SOW

✔✔171. Risk control forms have 9 fields which are: - ✔✔unique ID, description,
probability, impact, timescale, cost, owner, response, early warning signs

✔✔172. How does an OBS (organization breakdown structure) differ from a traditional
organizational chart? - ✔✔It covers everyone involved regardless of the company or
organization

✔✔173. The WBS must cover all of the elements of the project including: _______,
________, and ________. - ✔✔planning, implementing and closing out the project

✔✔174. True or False: The WBS should be as specific as possible. - ✔✔True

✔✔175. What uses network diagrams to identify predecessor and successor
relationships on projects? - ✔✔PERT

✔✔176. What uses a network diagram by identifying the chain of events that take the
longest time to complete on the project? - ✔✔CPM

✔✔177. List the four network diagram dependencies. - ✔✔finish-start (Task A can't start
til task B is finished), finish-finish , start-start, start-finish

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
182
Member since
1 year
Number of followers
7
Documents
24136
Last sold
3 days ago
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.7

33 reviews

5
14
4
6
3
7
2
0
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions